Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Angle Rd - Belcher Canal' (1) ·
'Angle Rd.- Belcher Canal' (1) ·
'C-23 CANAL ' (1) ·
'Cougar Wildlife Crossing' (1) ·
'Deer Wildlife Crossing ' (1) ·
'Galiano Rd. & C-24 Canal' (1) ·
'Header Canal ' (1) ·
'Moore's Creek ' (1) ·
'North Relief Canal ' (1) ·
'PAHOKEE DRAIN CANAL M-2 ' (1) ·
'SR-91 N/S TPK ' (1) ·
'SR-91 TPK(GLADES RD INT)' (1)
790205 (1) ·
790207 (1) ·
884082 (1) ·
890110 (1) ·
890111 (1) ·
930450 (1) ·
931011 (1) ·
934553 (1) ·
940092 (1) ·
940093 (1) ·
940113 (1) ·
940119 (1) ·
940151 (1)
'1 mile North of SR-70 ' (1) ·
'1.2MI S OF US-98 ' (1) ·
'2 mi. N of Gatlin Blvd. ' (1) ·
'2.5 mi. N of SR 70 ' (1) ·
'2mi. N of SR714 on I95 ' (1) ·
'2mi.N of SR714 on I95 ' (1) ·
'56th Place North ' (1) ·
'7.0 mi. W of FL Turnpike ' (1) ·
'BOCA RATON INTERCHNG #28 ' (1) ·
'i-4 WB - Cougar Crossing ' (1) ·
'SR 400 WB over Deer Wildl' (1) ·
'SR-710 TPK Interchange ' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 13 results in range #1 to #13.