Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'6th Avenue South ' (1) ·
'CR 702 45th Street ' (1) ·
'CR 812 LANTANA RD ' (1) ·
'CSX Railroad ' (1) ·
'E-2W Canal ' (1) ·
'I-95 ' (1) ·
'L-5 Canal ' (1) ·
'Lantana Road ' (1) ·
'LWDD E-2E Canal ' (1) ·
'Northlake Blvd. ' (1) ·
'Northlake Blvd. WB ' (1) ·
'SR 708 (Blue Heron Blvd)' (1) ·
'SR-91 Turnpike ' (1) ·
'WPB Drainage Canal ' (1)
'CLINT MOORE RD EB ' (1) ·
'Dunn Avenue ' (1) ·
'E/B Atlantic Ave. ' (1) ·
'EB Okee. Blvd. ' (1) ·
'I 95 SR 9 ' (1) ·
'I-95 (SR 9) ' (1) ·
'Loxahatchee Slough' (1) ·
'NB US-27 SR-25 ' (1) ·
'SB I 95 to Lantana' (1) ·
'SB US-27 SR-25 ' (1) ·
'SR-528 EB ' (1) ·
'SR91 SB TPK 91.26 ' (1) ·
'SW 23 Ave Golf Rd ' (1) ·
'WB Okee. Blvd. ' (1)
700198 (1) ·
794189 (1) ·
930275 (1) ·
930303 (1) ·
930352 (1) ·
930353 (1) ·
930417 (1) ·
930418 (1) ·
930437 (1) ·
930458 (1) ·
930516 (1) ·
930519 (1) ·
930520 (1) ·
930540 (1) ·
931003 (1) ·
934167 (1) ·
934969 (1)
'1 mi N Palm Bch Lake Blvd' (1) ·
'1.3mi South of 10th Ave N' (1) ·
'1.45 Mi W of Bee Line Hwy' (1) ·
'1.9 Miles East of US-441 ' (1) ·
'2.0 MI N of US-92 on I-95' (1) ·
'2.1MI S LAKEWORTH INTERCH' (1) ·
'At Exit 74 ' (1) ·
'At Exit 76 ' (1) ·
'Atlantic Ave./Fl. Tpk. ' (1) ·
'Between SR 710 and 786 ' (1) ·
'Just West of I 95 ' (1) ·
'Lantana I 95 Interchange ' (1) ·
'Palm Beach - Broward Line' (1) ·
'SR-528 EB at I-95 ' (1) ·
'SR-704 Over SR-91 ' (1)
12000 (1) ·
13700 (1) ·
14878 (1) ·
15250 (1) ·
160500 (1) ·
19000 (1) ·
200 (1) ·
213000 (1) ·
232000 (1) ·
32500 (1) ·
32750 (1) ·
3550 (1) ·
39250 (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
20820 (1) ·
23770 (1) ·
25813 (1) ·
26459 (1) ·
278468 (1) ·
32965 (1) ·
369555 (1) ·
402520 (1) ·
40625 (1) ·
420 (1) ·
56821 (1) ·
6159 (1) ·
68099 (1)
Showing below up to 17 results in range #1 to #17.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)