Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'CLINT MOORE RD EB ' (1) ·
'Dunn Avenue ' (1) ·
'E/B Atlantic Ave. ' (1) ·
'EB Okee. Blvd. ' (1) ·
'Forest Hill Blvd. ' (1) ·
'Loxahatchee Slough' (1) ·
'NB US-27 SR-25 ' (1) ·
'SB I 95 to Lantana' (1) ·
'SB US-27 SR-25 ' (1) ·
'SR-528 EB ' (1) ·
'SR91 SB TPK 91.26 ' (1) ·
'SW 23 Ave Golf Rd ' (1) ·
'WB Okee. Blvd. ' (1)
700198 (1) ·
794189 (1) ·
930275 (1) ·
930303 (1) ·
930352 (1) ·
930353 (1) ·
930417 (1) ·
930418 (1) ·
930437 (1) ·
931003 (1) ·
934167 (1) ·
934327 (1) ·
934969 (1)
'1.45 Mi W of Bee Line Hwy' (1) ·
'1.9 Miles East of US-441 ' (1) ·
'2.0 MI N of US-92 on I-95' (1) ·
'2.1MI S LAKEWORTH INTERCH' (1) ·
'Atlantic Ave./Fl. Tpk. ' (1) ·
'Just E SR 7-Forest Hill ' (1) ·
'Just West of I 95 ' (1) ·
'Lantana I 95 Interchange ' (1) ·
'Palm Beach - Broward Line' (1) ·
'SR-528 EB at I-95 ' (1) ·
'SR-704 Over SR-91 ' (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 13 results in range #1 to #13.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)