Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Banana River ' (1) ·
'Banana River Drive ' (1) ·
'Barge Canal ' (1) ·
'BRANCH OF MIAMI CANAL ' (1) ·
'BULLDOG CANAL ' (1) ·
'CANAL C-24 ' (1) ·
'Drainage Ditch ' (1) ·
'ELKCAM WATERWAY ' (1) ·
'Gatlin Blvd ' (1) ·
'Halifax Canal ' (1) ·
'I 95 and SR 704 ' (1) ·
'Indian River ' (1) ·
'Intracoastal Waterway ' (1) ·
'IWW Indian River ' (1) ·
'Misner Branch ' (1) ·
'Service Rd & Canal ' (1) ·
'SR-442 ' (1) ·
'St. Lucie Canal ' (1) ·
'Tide Relief Canal ' (1)
'Center Avenue ' (1) ·
'EB Spanish Rvr Bvd' (1) ·
'G BUSH BLVD(NE8TH)' (1) ·
'I-95 NB ' (1) ·
'Main Trail ' (1) ·
'MIAMI CANAL ROAD ' (1) ·
'NB I-95 (SR-9) ' (1) ·
'NORTH SHORE DRIVE ' (1) ·
'PERIWINKLE DRIVE ' (1) ·
'SAVONA BLVD. ' (1) ·
'SB I-95 (SR-9) ' (1) ·
'Spotted Fawn Way ' (1) ·
'SR-3 ' (1) ·
'SR-401 SB ' (1) ·
'SR-404 EB ' (1) ·
'SR-404 WB ' (1) ·
'SR-44 ' (1) ·
'SR-528 ' (1) ·
'SR-528 WB ' (1) ·
'SR-A1A ' (1) ·
'WB Spanish River ' (1) ·
'WB SR704 to SB I95' (1)
700030 (1) ·
700072 (1) ·
700081 (1) ·
700110 (1) ·
700113 (1) ·
700115 (1) ·
700143 (1) ·
700221 (1) ·
704203 (1) ·
790063 (1) ·
790172 (1) ·
795521 (1) ·
796000 (1) ·
885601 (1) ·
890132 (1) ·
890133 (1) ·
930026 (1) ·
930154 (1) ·
930226 (1) ·
930361 (1) ·
930469 (1) ·
934516 (1) ·
937702 (1) ·
940108 (1) ·
945256 (1)
'0.2Mi S of 45TH ST(CR702)' (1) ·
'0.3MI E OF US-1 ' (1) ·
'0.5MI N of GATLIN BLVD. ' (1) ·
'0.8 Mile West of Nova Rd ' (1) ·
'1.0MI E OF BANANA RIV DR ' (1) ·
'1.8MI N OF CR 510 ' (1) ·
'1mi N of SR-76(Kanner Hw)' (1) ·
'2.2MI S OF SR-80 ' (1) ·
'2.55 Miles East of SR-3 ' (1) ·
'4.3 m N of Martin Co Line' (1) ·
'A1A on Singer Island ' (1) ·
'At Intersection w LPGA BL' (1) ·
'At Lake Washington Rd ' (1) ·
'EB SR800 .2mi West of A1A' (1) ·
'I-95 NB over SR-442 ' (1) ·
'I-95 SR 704 interchange ' (1) ·
'SR-3 SB over Barge Canal ' (1) ·
'SR-401 SB - Barge Canal ' (1) ·
'SR-404 EB - Indian River ' (1) ·
'SR-404 WB - Banana River ' (1) ·
'SR-44 - Indian River ' (1) ·
'SR-528 EB - Indian River ' (1) ·
'SR-528 WB - Indian River ' (1) ·
'WB SR800.2Mi west of US-1' (1)
26231074 (1) ·
26231130 (1) ·
26282666 (1) ·
26400360 (1) ·
26422570 (1) ·
26450312 (1) ·
26490902 (1) ·
27070958 (1) ·
27071400 (1) ·
27155288 (1) ·
27161021 (1) ·
27453074 (1) ·
28085200 (1) ·
28122256 (1) ·
28123758 (1) ·
28240920 (1) ·
28241003 (1) ·
28241813 (1) ·
28241828 (1) ·
28242777 (1) ·
28243313 (1) ·
28570264 (1) ·
29021928 (1) ·
29143174 (1) ·
29165358 (1)
80022456 (1) ·
80034367 (1) ·
80041209 (1) ·
80041536 (1) ·
80043790 (1) ·
80044331 (1) ·
80160809 (1) ·
80161732 (1) ·
80231068 (1) ·
80252110 (1) ·
80290638 (1) ·
80374130 (1) ·
80375608 (1) ·
80384625 (1) ·
80390039 (1) ·
80394909 (1) ·
80422154 (1) ·
80424100 (1) ·
80440500 (1) ·
80440519 (1) ·
80491520 (1) ·
80542264 (1) ·
80570125 (1) ·
81030053 (1) ·
81054109 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 25 results in range #1 to #25.