Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'14TH STREET CANAL ' (1) ·
'Burns Road ' (1) ·
'C-3 Canal ' (1) ·
'CR 782 Linton Blvd ' (1) ·
'IWW Halifax River ' (1) ·
'IWW Indian River ' (1) ·
'LATERAL CANAL #38 ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'M-1 CANAL ' (1) ·
'NORTH NEW RIVER CANAL ' (1) ·
'SR 710 & SCL RR ' (1) ·
'SR 804 BOYNTON BCH BLVD ' (1) ·
'SR 91 TPK ' (1) ·
'SR-91 (FL. TPK.) ' (1) ·
Indian River ICW (1)
'10TH AVE NORTH ' (1) ·
'CR-603-IND RIV BLV' (1) ·
'CR708 125.4 ' (1) ·
'CRESTWOOD BLVD. N ' (1) ·
'Lake Ida Road ' (1) ·
'NB I 95 SR 9 ' (1) ·
'NB I-95 (S.R.9) ' (1) ·
'SR-44 ' (1) ·
'SR-76(Kanner Hwy )' (1) ·
'SR-80 ' (1) ·
'SR-A1A ' (1) ·
'SR91 N/S TPK 106.1' (1) ·
'SR91 N/S TPK 86.95' (1) ·
'SR91 N/S TPK 92.1 ' (1) ·
SR-518 (1)
700184 (1) ·
790148 (1) ·
790152 (1) ·
884054 (1) ·
890119 (1) ·
890126 (1) ·
930029 (1) ·
930159 (1) ·
930223 (1) ·
930428 (1) ·
930500 (1) ·
930521 (1) ·
934348 (1) ·
934963 (1) ·
937367 (1)
'.25mi W OF I-95 ' (1) ·
'.2mi East of US-27 ' (1) ·
'0.1 MILE WEST OF I-95 ' (1) ·
'0.3MI W OF ROYAL PALM BL ' (1) ·
'0.9MI W OF MILITARY TRAIL' (1) ·
'1.2 MI NO OF LANTANA RD ' (1) ·
'1.4MI NORTH OF US-1 ' (1) ·
'1.5 miles South of SR 806' (1) ·
'1Mi E of CR809/Military T' (1) ·
'3.33 Miles S/O PGA BLVD ' (1) ·
'6.2 MILES SOUTH OF SR-802' (1) ·
'Between N Lake/PGA Blvds.' (1) ·
'SR-44 - Indian River ' (1) ·
'SR-A1A over Halifax River' (1) ·
SR-518 over Indian River (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
119194 (1) ·
136198 (1) ·
148776 (1) ·
157712 (1) ·
1730 (1) ·
1735 (1) ·
181308 (1) ·
23076 (1) ·
27000 (1) ·
28801 (1) ·
37302 (1) ·
46846 (1) ·
52050 (1) ·
52918 (1) ·
61592 (1)
Showing below up to 15 results in range #1 to #15.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)