Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'4th St. and Canal D ' (1) ·
'C-15 Canal ' (1) ·
'C-17 CANAL ' (1) ·
'C-51 CANAL ' (1) ·
'E-2 East Canal ' (1) ·
'E-2 West Canal ' (1) ·
'FL. TPK. SR-91 ' (1) ·
'FLORIDA TURNPIKE SR-91 ' (1) ·
'FORK OF ST. LUCIE RIVER ' (1) ·
'I 95 SR 9 ' (1) ·
'I-95 ' (1) ·
'Jupiter Creek ' (1) ·
'KRUEGER CREEK ' (1) ·
'LWDD L30 Canal ' (1) ·
'Palm Beach Canal C-51 ' (1) ·
'Palmetto Park Road ' (1) ·
'SR 811 & FEC RR ' (1) ·
'ST. LUCIE RIVER ' (1) ·
'W Camino Real ' (1) ·
'W. Camino Real ' (1) ·
Banana River Relief (1) ·
Horse Creek (1)
'CR-516 ' (1) ·
'CR-A1A(OCEAN BLVD)' (1) ·
'EB SR 704 ' (1) ·
'EB SR 786 ' (1) ·
'Hagen Ranch Road ' (1) ·
'I 95 NB ' (1) ·
'I 95 SB ' (1) ·
'Indiantown Road ' (1) ·
'JOG ROAD ' (1) ·
'LYONS ROAD ' (1) ·
'PGA Blvd. (SR 786)' (1) ·
'PRIMA VISTA BLVD. ' (1) ·
'PROSPERITY FARMS R' (1) ·
'SB I 95 SR 9 ' (1) ·
'SR 9 (I-95) ' (1) ·
'SR-5/S. Olive Ave.' (1) ·
'SR-808 Glades Road' (1) ·
SR-520 (1) ·
US-1 (1)
700188 (1) ·
700192 (1) ·
700206 (1) ·
880100 (1) ·
890120 (1) ·
930184 (1) ·
930187 (1) ·
930198 (1) ·
930199 (1) ·
930210 (1) ·
930265 (1) ·
930367 (1) ·
930414 (1) ·
930415 (1) ·
930420 (1) ·
930491 (1) ·
934116 (1) ·
934297 (1) ·
934731 (1) ·
934958 (1) ·
944011 (1) ·
944012 (1)
'.5mi East US1 Lakeworth ' (1) ·
'.7mi. E of Congress Ave. ' (1) ·
'0.3MI N OF N. LAKE BLVD. ' (1) ·
'0.8 MI W OF US-1 ' (1) ·
'0.9 MI W OF US-1 ' (1) ·
'1 mile S of Linton Blvd ' (1) ·
'1.0M S OF OKEECHOBEE BLVD' (1) ·
'1.1 mi. N of Broward line' (1) ·
'1.1mil N. of Broward line' (1) ·
'1st overpass east of I-95' (1) ·
'2.0 mi S of SR-60 ' (1) ·
'2.0 Miles N of SR-806 ' (1) ·
'2.3 Mi. East of I-95 ' (1) ·
'2MI E of SR-76 ' (1) ·
'Boca Raton ' (1) ·
'CR-516 over I-95 ' (1) ·
'Glades Rd. & Turnpike ' (1) ·
'LYONS ROAD SOUTH OF SR-80' (1) ·
'Tpk/PGA Blvd interchange ' (1) ·
SR-520 - Banana River (1) ·
US-1 over Horse Creek (1)
26203900 (1) ·
26210275 (1) ·
26220391 (1) ·
26220396 (1) ·
26252840 (1) ·
26290179 (1) ·
26383900 (1) ·
26404575 (1) ·
26420393 (1) ·
26422136 (1) ·
26485165 (1) ·
26502106 (1) ·
26503600 (1) ·
26560189 (1) ·
27115100 (1) ·
27192572 (1) ·
27193001 (1) ·
27363540 (1) ·
28020728 (1) ·
28100028 (1) ·
28212829 (1)
80030866 (1) ·
80042484 (1) ·
80043390 (1) ·
80052490 (1) ·
80054600 (1) ·
80064817 (1) ·
80070410 (1) ·
80070450 (1) ·
80070535 (1) ·
80074689 (1) ·
80085094 (1) ·
80094882 (1) ·
80101354 (1) ·
80101677 (1) ·
80110316 (1) ·
80135670 (1) ·
80195964 (1) ·
80200618 (1) ·
80304170 (1) ·
80365438 (1) ·
80384071 (1) ·
80392393 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations (including piles) on dry land well above flood water elevations. (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 22 results in range #1 to #22.