Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Berrys Canal ' (1) ·
'CANAL C-17 ' (1) ·
'EB SR80 & C-51 Canal ' (1) ·
'I-95 (SR-9) ' (1) ·
'ICWW ' (1) ·
'Indian River East Relief' (1) ·
'INTRACOASTAL WATERWAY ' (1) ·
'LWDD L-2 CANAL ' (1) ·
'South Relief Canal ' (1) ·
'SR 91 TPK ' (1) ·
'SR-44 ' (1) ·
'ST LUCIE CANAL ' (1) ·
'St Lucie River / SR-707 ' (1) ·
'St. Lucie River/SR-707 ' (1) ·
'US-1 & FECRR ' (1) ·
'US-17-92 -St Johns River' (1) ·
'US-17-92-St Johns River ' (1) ·
'US-92 ' (1) ·
'WB SR 80 ' (1)
'CONGRESS AVE ' (1) ·
'DNLD RS RD E 112.2' (1) ·
'DNLD RS RD W 112.2' (1) ·
'Emerson Ave 27th A' (1) ·
'I-4 EB ' (1) ·
'I-4 WB ' (1) ·
'I-95 ' (1) ·
'I-95 SB ' (1) ·
'NB SR 807 ' (1) ·
'NB US-1 / SR-5 ' (1) ·
'PALMETTO PARK ROAD' (1) ·
'PARK AVE. W. ' (1) ·
'SB SR 807 ' (1) ·
'SB US-1/SR-5 ' (1) ·
'SR 91 TPK SB 131.0' (1) ·
'SR-44 ' (1) ·
'SR-732 Jensen Bch.' (1) ·
'SR-A1A (Ocean Ave)' (1) ·
'W/B S.R. 704 ' (1)
790064 (1) ·
790072 (1) ·
790128 (1) ·
790149 (1) ·
790196 (1) ·
790197 (1) ·
880088 (1) ·
890066 (1) ·
890146 (1) ·
890150 (1) ·
890151 (1) ·
890152 (1) ·
930183 (1) ·
930381 (1) ·
930419 (1) ·
930475 (1) ·
930476 (1) ·
930532 (1) ·
930533 (1) ·
934164 (1) ·
934251 (1) ·
934908 (1)
'.75mi E. of Indian R Dr. ' (1) ·
'.7mi. E of Congress Ave. ' (1) ·
'0.3MI W OF CONGRESS AVE ' (1) ·
'0.5MI S OF OKEECHOBEE BLV' (1) ·
'0.8 MILE EAST OF US-1 ' (1) ·
'1mi S of SR-707 on SR-5 ' (1) ·
'2.8MI S OF SR-60 ' (1) ·
'3 MI NORTH OF PGA BLVD ' (1) ·
'3.7MI S/O STUART INT. ' (1) ·
'4.03Miles E of SR5 on A1A' (1) ·
'I-4EB-US-17-92 St Johns R' (1) ·
'I-4WB-US-17-92 St Johns R' (1) ·
'I-95 NB over US-92 ' (1) ·
'I-95 SB - SR-44 ' (1) ·
'N.OF PGA BLVD S.JUPITER ' (1) ·
'SE quadrant PB Int Airpt ' (1) ·
'SR-44 - Berrys Canal ' (1) ·
'SR-44 over US-1 ' (1)
26210242 (1) ·
26403485 (1) ·
26403530 (1) ·
26403721 (1) ·
26403812 (1) ·
26415533 (1) ·
26422223 (1) ·
26475062 (1) ·
26525829 (1) ·
26525885 (1) ·
27070362 (1) ·
27120317 (1) ·
27121800 (1) ·
27122400 (1) ·
27151700 (1) ·
27355287 (1) ·
28500676 (1) ·
28500808 (1) ·
29004602 (1) ·
29011550 (1) ·
29014148 (1) ·
29102131 (1)
80043087 (1) ·
80043210 (1) ·
80045427 (1) ·
80045433 (1) ·
80045945 (1) ·
80045990 (1) ·
80051244 (1) ·
80052450 (1) ·
80075174 (1) ·
80075197 (1) ·
80113000 (1) ·
80124800 (1) ·
80152627 (1) ·
80153156 (1) ·
80162980 (1) ·
80245043 (1) ·
80551845 (1) ·
80553031 (1) ·
80591757 (1) ·
81050336 (1) ·
81190878 (1) ·
81191063 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 22 results in range #1 to #22.