Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
934140 (1) ·
934221 (1) ·
934402 (1) ·
934513 (1) ·
934903 (1) ·
934905 (1) ·
937353 (1) ·
937358 (1) ·
937359 (1) ·
940067 (1) ·
940068 (1) ·
945255 (1)
'0.1MI W of HAVERHILL RD. ' (1) ·
'0.2MI E OF US-441 (SR-7) ' (1) ·
'0.6MI EAST OF MCNEIL ROAD' (1) ·
'1.6MI N OF GATLIN BLVD. ' (1) ·
'100FT N ANGLE RD CR-607A ' (1) ·
'175FT S of LAS PALMAS ST ' (1) ·
'180FT E OF SANDPIPER AVE ' (1) ·
'180ft W of LAS PALMAS ST.' (1) ·
'6MI E OF BELLE GLADE ' (1) ·
'82FT EAST OF SR-7 ' (1) ·
'At S Military Trail ' (1) ·
'At SR-7/US-441 ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 12 results in range #1 to #12.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)