Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-51 Canal ' (1) ·
'Canal L-14 ' (1) ·
'E-2W Canal ' (1) ·
'Haverhill Rd. & U Turns ' (1) ·
'I 95 SR 9 ' (1) ·
'I-95 ' (1) ·
'Jog Rd. & Turn Arounds ' (1) ·
'Lateral A Canal ' (1) ·
'Palmetto Park Road ' (1) ·
'S. R. 7 & Return Ramps ' (1) ·
'South Relief Canal ' (1) ·
'SR 809 (Military Trail) ' (1) ·
'SR 811 & FEC RR ' (1) ·
'Summit Boulevard ' (1)
'16th St/College Ln' (1) ·
'Benoist Farms Rd ' (1) ·
'Congress Ave. ' (1) ·
'Congress Avenue ' (1) ·
'CR605 Old Dixie ' (1) ·
'EB SR 704 ' (1) ·
'EB SR 786 ' (1) ·
'I 95 NB ' (1) ·
'NB I 95 SR 9 ' (1) ·
'Pineda Causeway ' (1) ·
'SR 80-Southern Bvd' (1) ·
'SR 80/Southern Bld' (1) ·
'SR 80/Southern Bvd' (1) ·
'W/B Atlantic Ave ' (1)
700225 (1) ·
884084 (1) ·
884086 (1) ·
930163 (1) ·
930199 (1) ·
930210 (1) ·
930292 (1) ·
930440 (1) ·
930457 (1) ·
930459 (1) ·
930491 (1) ·
930525 (1) ·
930527 (1) ·
930528 (1) ·
934711 (1)
'.7mi. E of Congress Ave. ' (1) ·
'0.5Mi South of 6th Ave S ' (1) ·
'1.3 Mi. North of CR-606 ' (1) ·
'1st overpass east of I-95' (1) ·
'2 miles west of Turnpike ' (1) ·
'2.6 MI S of Wickham Rd. ' (1) ·
'Atlantic Ave./Fl. Tpk. ' (1) ·
'Benoist Farms Rd at SR-80' (1) ·
'Between SR 80 and SR 882 ' (1) ·
'Between SR704 and 12th St' (1) ·
'Boca Raton ' (1) ·
'E Jog Rd. & W SR 80 ' (1) ·
'East Tpk & West SR 809 ' (1) ·
'Inter 66th Ave/College Ln' (1) ·
'SW quadrant PB Int Airprt' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
122864 (1) ·
125788 (1) ·
130993 (1) ·
137065 (1) ·
14748 (1) ·
15000 (1) ·
177838 (1) ·
199525 (1) ·
23943 (1) ·
26459 (1) ·
28194 (1) ·
33486 (1) ·
5205 (1) ·
55954 (1) ·
66364 (1)
Showing below up to 15 results in range #1 to #15.