Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'33rd Street ' (1) ·
'49th St Lindsey Rd' (1) ·
'4th Street ' (1) ·
'CR-611 (45th ST.) ' (1) ·
'CR-630 (41st St.) ' (1) ·
'EB SR808 Glades Rd' (1) ·
'Hatton Road ' (1) ·
'NB I 95 SR9 ' (1) ·
'Northlake Blvd. EB' (1) ·
'SB I-95 (SR 9) ' (1) ·
'SB I-95 (SR-9 ) ' (1) ·
'SR-5 (US-1) NB ' (1) ·
'US-1 (SR-5) SB ' (1)
880103 (1) ·
880104 (1) ·
884074 (1) ·
884100 (1) ·
884102 (1) ·
884103 (1) ·
884104 (1) ·
890121 (1) ·
890129 (1) ·
930248 (1) ·
930372 (1) ·
934168 (1) ·
934552 (1)
'1 Mi. S of US-441 ' (1) ·
'1.45 Mi W of Bee Line Hwy' (1) ·
'1.5 N of SW KANNER HWY ' (1) ·
'2.1 Miles S of Oslo Rd. ' (1) ·
'80ft. East of 66th Ave. ' (1) ·
'At CR-613 ' (1) ·
'AT CR-615 (66TH AVE.) ' (1) ·
'At CR-615 (66th Ave) ' (1) ·
'At CR-615 (66th Avenue) ' (1) ·
'Jupiter Interchange/I-95 ' (1) ·
'South of St Lucie Canal ' (1) ·
'SR 808 I 95 Interchange ' (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 13 results in range #1 to #13.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)