Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BELCHER CANAL C-25 ' (1) ·
'C-24 CANAL ' (1) ·
'C-51 CANAL ' (1) ·
'CANAL C-24 ' (1) ·
'CORAL GARDENS OUTFALL ' (1) ·
'EL RIO (E-4) CANAL ' (1) ·
'EL RIO CANAL ' (1) ·
'FIVE MILE CREEK ' (1) ·
'Hillsboro Canal ' (1) ·
'I-4 EB Ramp B ' (1) ·
'L-5 Canal ' (1) ·
'LOXAHATCHEE RIVER ' (1) ·
'RANGE LINE CANAL ' (1) ·
'Seaboard Coastline RR ' (1) ·
'SR 91 TPK & CANAL ' (1) ·
'SUBDIVISION CANAL ' (1) ·
'TEN MILE CREEK ' (1) ·
'TIDAL CANAL ' (1) ·
'Turkey Creek ' (1)
'CAMINO GARDENS WB ' (1) ·
'CARLTON RD (CR613)' (1) ·
'CORAL DRIVE ' (1) ·
'CR-508 (69TH ST.) ' (1) ·
'CR-880 ' (1) ·
'CR603(JOHNSTON RD)' (1) ·
'CR611B(EDWARDS RD)' (1) ·
'CR611B(SELVITZ RD)' (1) ·
'French Avenue ' (1) ·
'GLADES CUTOFF ' (1) ·
'HURON WAY ' (1) ·
'I-4 WB ' (1) ·
'KIRBY LOOP ROAD ' (1) ·
'Levee Road ' (1) ·
'LOWSON BOULEVARD ' (1) ·
'Old Samsula Dr ' (1) ·
'Private Road ' (1) ·
'RDBGH RD 170.14 ' (1) ·
'SE ISLAND WAY ROAD' (1) ·
'SHINN ROAD ' (1) ·
'SIMARA STREET ' (1) ·
'VENICE DRIVE ' (1)
790106 (1) ·
794006 (1) ·
794020 (1) ·
884028 (1) ·
894019 (1) ·
894048 (1) ·
895504 (1) ·
930802 (1) ·
930812 (1) ·
930940 (1) ·
935210 (1) ·
935301 (1) ·
935302 (1) ·
935507 (1) ·
940015 (1) ·
940018 (1) ·
940019 (1) ·
940060 (1) ·
940067 (1) ·
940069 (1) ·
940070 (1) ·
940071 (1)
'0.03Mi E of CYPRESS WAY ' (1) ·
'0.1Mi E of ONTARIO DRIVE ' (1) ·
'0.1MI S OF OLD BOYNTON ' (1) ·
'0.1MI W of US-98 / SR-441' (1) ·
'0.2 MI W of CONGRESS AVE ' (1) ·
'0.2MI E of LOXAHATCHEE RD' (1) ·
'0.2MI S OF EDWARDS RD ' (1) ·
'0.3 mi North of Taylor Rd' (1) ·
'0.6 Mile West of US-27 ' (1) ·
'0.6MI EAST OF MCNEIL ROAD' (1) ·
'1.0 Mi E of Nob Hill Road' (1) ·
'100FT N OF ANGLE ROAD ' (1) ·
'1MI W OF CR-615 ' (1) ·
'1MI E of MCNEIL ROAD ' (1) ·
'2 miles West of US-17 ' (1) ·
'2.1MI S of SR-70 ' (1) ·
'3.4 MI S INDIAN RIVER CO ' (1) ·
'3MI S of SR-70 ' (1) ·
'5.2MI S of CR-712 ' (1) ·
'650FT E OF SEWALLS PT. RD' (1) ·
'I-4 WB over I-4 EB Ramp B' (1)
26200200 (1) ·
26202815 (1) ·
26210580 (1) ·
26264610 (1) ·
26315252 (1) ·
26315259 (1) ·
26410771 (1) ·
26582879 (1) ·
27085780 (1) ·
27111660 (1) ·
27191320 (1) ·
27201709 (1) ·
27201783 (1) ·
27241547 (1) ·
27243079 (1) ·
27245404 (1) ·
27281239 (1) ·
27320060 (1) ·
27431016 (1) ·
28570842 (1) ·
29051124 (1) ·
29091631 (1)
80050093 (1) ·
80050590 (1) ·
80054787 (1) ·
80054885 (1) ·
80081246 (1) ·
80112090 (1) ·
80142587 (1) ·
80165951 (1) ·
80212904 (1) ·
80214936 (1) ·
80215950 (1) ·
80232057 (1) ·
80251175 (1) ·
80271215 (1) ·
80282441 (1) ·
80284193 (1) ·
80324598 (1) ·
80324800 (1) ·
80363628 (1) ·
81042872 (1) ·
81044346 (1) ·
81195603 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour conditions; field review indicates action is required to protect exposed foundations (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 22 results in range #1 to #22.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)