Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Angle Rd - Belcher Canal' (1) ·
'Angle Rd.- Belcher Canal' (1) ·
'Berrys Canal ' (1) ·
'C-18 Canal ' (1) ·
'C-23 CANAL ' (1) ·
'E-1 CANAL ' (1) ·
'E-3 Canal ' (1) ·
'Galiano Rd. & C-24 Canal' (1) ·
'I-95 (SR-9) ' (1) ·
'Indian River East Relief' (1) ·
'INTRACOASTAL WATERWAY ' (1) ·
'LATERAL CANAL #45 ' (1) ·
'South Relief Canal ' (1) ·
'SR-44 ' (1) ·
'US-1 & FECRR ' (1) ·
'US-92 ' (1)
'Emerson Ave 27th A' (1) ·
'I-95 ' (1) ·
'I-95 SB ' (1) ·
'Indiantown Rd. ' (1) ·
'NB I-95 (SR-9) ' (1) ·
'NB I-95 (SR-9) ' (1) ·
'PALMETTO PARK RD. ' (1) ·
'PALMETTO PARK ROAD' (1) ·
'SB I-95 (SR-9) ' (1) ·
'SR-44 ' (1) ·
'SR-732 Jensen Bch.' (1) ·
'SR-808 Glades Road' (1) ·
'SR91 N/S TPK 76.17' (1) ·
'W/B S.R. 704 ' (1)
790064 (1) ·
790072 (1) ·
790128 (1) ·
790149 (1) ·
880088 (1) ·
890110 (1) ·
890111 (1) ·
890146 (1) ·
930183 (1) ·
930325 (1) ·
930391 (1) ·
930412 (1) ·
934908 (1) ·
934924 (1) ·
940092 (1) ·
940093 (1) ·
940113 (1)
'.5 mi East of I-95 ' (1) ·
'.75mi E. of Indian R Dr. ' (1) ·
'.7mi. E of Congress Ave. ' (1) ·
'0.5 mile West of I-95 ' (1) ·
'0.8 MILE EAST OF US-1 ' (1) ·
'2 mi. N of Gatlin Blvd. ' (1) ·
'2.5 mi. N of SR 70 ' (1) ·
'2.8MI S OF SR-60 ' (1) ·
'2mi. N of SR714 on I95 ' (1) ·
'2mi.N of SR714 on I95 ' (1) ·
'I-95 NB over US-92 ' (1) ·
'I-95 SB - SR-44 ' (1) ·
'PALMETTO PK RD US-441 SR7' (1) ·
'SR-44 - Berrys Canal ' (1) ·
'SR-44 over US-1 ' (1) ·
'SR-91 OVER LAT CANAL 45 ' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
107570 (1) ·
113642 (1) ·
171592 (1) ·
17177 (1) ·
17697 (1) ·
21372 (1) ·
27240 (1) ·
31751 (1) ·
35268 (1) ·
37302 (1) ·
51387 (1) ·
54946 (1) ·
55954 (1) ·
57689 (1) ·
67231 (1)
Showing below up to 17 results in range #1 to #17.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)