Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Banana River ' (1) ·
'CANAL ' (1) ·
'Daytona Canal ' (1) ·
'Halifax River ' (1) ·
'Indian River ' (1) ·
'Indian River Relief ' (1) ·
'Intracoastal Waterway ' (1) ·
'JOANN CANAL ' (1) ·
'LAKE WORTH ' (1) ·
'LATERAL A CANAL ' (1) ·
'LATERAL CANAL C ' (1) ·
'RELIEF CANAL ' (1) ·
'Sebastian Inlet ' (1) ·
'SEBASTIAN RIVER PRONG ' (1) ·
'Service Rd & Canal ' (1) ·
'Turnbull Creek ' (1) ·
INDIAN RIVER (1)
'4TH STREET ' (1) ·
'61ST./PECAN GROVE ' (1) ·
'Ballough Street ' (1) ·
'CR-505 ROSELAND RD' (1) ·
'CR-508 (69TH ST.) ' (1) ·
'CR-510 WABASSO RD ' (1) ·
'CR-619 82ND AVE. ' (1) ·
'Highbridge Road ' (1) ·
'ISLAND ROAD ' (1) ·
'Main Street ' (1) ·
'Service Road ' (1) ·
'SR-401 SB ' (1) ·
'SR-404 EB ' (1) ·
'SR-404 WB ' (1) ·
'SR-528 ' (1) ·
'SR-528 WB ' (1) ·
'SR-A1A ' (1) ·
'US-1 (SR-5) ' (1) ·
'US-1 NB ' (1) ·
NASA CAUSEWAY EB (1) ·
NASA CAUSEWAY WB (1)
700031 (1) ·
700077 (1) ·
700110 (1) ·
700115 (1) ·
700143 (1) ·
703001 (1) ·
703002 (1) ·
704048 (1) ·
790086 (1) ·
794004 (1) ·
794025 (1) ·
795000 (1) ·
880005 (1) ·
880020 (1) ·
880063 (1) ·
884019 (1) ·
884022 (1) ·
884027 (1) ·
884038 (1) ·
884039 (1) ·
930004 (1) ·
936802 (1)
'.3 mi South of Mason Ave ' (1) ·
'0.2 mile East of US-1 ' (1) ·
'0.3 Mile West of SR-A1A ' (1) ·
'0.4MI W of S. COUNTY ROAD' (1) ·
'0.5 Mi W of SR-A1A ' (1) ·
'1 Mile South of SR-786 ' (1) ·
'1.0MI E OF BANANA RIV DR ' (1) ·
'1.1MI N OF SR-60 ' (1) ·
'1.1MI Wof CR-615(66th St)' (1) ·
'1.7MI N OF CR-512 ' (1) ·
'3.6 Miles West Of US-1 ' (1) ·
'6.2 Miles N of SR-510 ' (1) ·
'AT 74TH AVE. ' (1) ·
'AT CR-615 (66TH AVE.) ' (1) ·
'CR-615 (66TH AVE.) ' (1) ·
'SR-401 SB - Barge Canal ' (1) ·
'SR-404 EB - Indian River ' (1) ·
'SR-404 WB - Indian River ' (1) ·
'SR-528 WB - Indian River ' (1) ·
'US-1 NB - Turnbull Creek ' (1) ·
KENNEDY SPACE CENTER (1)
26414288 (1) ·
26495569 (1) ·
27363418 (1) ·
27392653 (1) ·
27421622 (1) ·
27430923 (1) ·
27431010 (1) ·
27445555 (1) ·
27481770 (1) ·
27513635 (1) ·
28122256 (1) ·
28122319 (1) ·
28241003 (1) ·
28241828 (1) ·
28243314 (1) ·
28313826 (1) ·
28313884 (1) ·
28370440 (1) ·
28491441 (1) ·
29132317 (1) ·
29133119 (1) ·
29243110 (1)
80023337 (1) ·
80033671 (1) ·
80265430 (1) ·
80274275 (1) ·
80274430 (1) ·
80284706 (1) ·
80285095 (1) ·
80294169 (1) ·
80294391 (1) ·
80301990 (1) ·
80375690 (1) ·
80384625 (1) ·
80390039 (1) ·
80390071 (1) ·
80440519 (1) ·
80454983 (1) ·
80480991 (1) ·
80513571 (1) ·
81010394 (1) ·
81012374 (1) ·
81060320 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 22 results in range #1 to #22.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)