Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-51 Canal ' (1) ·
'E-2W CANAL ' (1) ·
'I-95 Ramps & CSXRR ' (1) ·
'I-95 Rmp A C D G & CSXRR' (1) ·
'Indian River East Relief' (1) ·
'Kyoto Gardens Dr ' (1) ·
'Mercer Ave and CSX RR ' (1) ·
'Mercer Ave./CSX RR/Canal' (1) ·
'North Relief Canal ' (1) ·
'Ramps A G & C.S.X. RR ' (1) ·
'Ramps A&G/BelvedereRd/RR' (1) ·
'SR-713 (King Hwy) ' (1) ·
'SR-91 N/S TPK ' (1) ·
'Trib to Spruce Creek ' (1)
'56th Place North ' (1) ·
'Belvede to NB I-95' (1) ·
'EBSR80 to SBSR807 ' (1) ·
'NB I-95 to PBIA R ' (1) ·
'NB SR-9 (I-95) ' (1) ·
'PBIA Rp to NB I-95' (1) ·
'PBIA to SB I-95 ' (1) ·
'SB I 95 Off Ramp ' (1) ·
'SB I-95 to PBIA ' (1) ·
'SB SR-9 (I-95) ' (1) ·
'SR 811 to SB I 95 ' (1) ·
'SR-732 Jensen Bch.' (1) ·
'SR91 On/Off Rmp106' (1) ·
'SR91 SB OFF RP81.9' (1) ·
'Tomoka Farms Rd ' (1)
794045 (1) ·
884082 (1) ·
890146 (1) ·
930472 (1) ·
930481 (1) ·
930482 (1) ·
930483 (1) ·
930484 (1) ·
930485 (1) ·
930494 (1) ·
930526 (1) ·
931007 (1) ·
931011 (1) ·
940162 (1) ·
940163 (1)
'.75mi E. of Indian R Dr. ' (1) ·
'0.25 MI N OF ATLANTIC AVE' (1) ·
'0.9 Mi North of CR-4118 ' (1) ·
'1.5mi N of SR-68 ' (1) ·
'56th Place North ' (1) ·
'North of Belvedere Rd ' (1) ·
'NW quad SR811/786 intchge' (1) ·
'PBIA/I-95 Interchange ' (1) ·
'SB Ramp to WPB Airport ' (1) ·
'SE quadrant PB Int Airprt' (1) ·
'SR-710 TPK Interchange ' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 15 results in range #1 to #15.