Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-51 Canal ' (1) ·
'E-2W CANAL ' (1) ·
'G-370 East Inflow Canal ' (1) ·
'G-370 West Inflow Canal ' (1) ·
'I-95 ' (1) ·
'I-95 Ramps & CSXRR ' (1) ·
'I-95 Rmp A C D G & CSXRR' (1) ·
'Indian River ' (1) ·
'Intracoastal Waterway ' (1) ·
'Kyoto Gardens Dr ' (1) ·
'LWDD E-2E Canal ' (1) ·
'LWDD E-2W CANAL ' (1) ·
'LWDD E-4 CANAL ' (1) ·
'Mercer Ave and CSX RR ' (1) ·
'Mercer Ave./CSX RR/Canal' (1) ·
'Northlake Blvd. WB ' (1) ·
'Platt Ranch Access Road ' (1) ·
'Ramps A G & C.S.X. RR ' (1) ·
'Ramps A&G/BelvedereRd/RR' (1) ·
'SR-91 (FL TURNPIKE) ' (1) ·
'Trib to Spruce Creek ' (1)
'Bellevue Avenue ' (1) ·
'Belvede to NB I-95' (1) ·
'CLINT MOORE RD EB ' (1) ·
'CLINT MOORE RD. EB' (1) ·
'Dunn Avenue ' (1) ·
'E/B Atlantic Ave. ' (1) ·
'EBSR80 to SBSR807 ' (1) ·
'Loxahatchee Slough' (1) ·
'NB I-95 to PBIA R ' (1) ·
'PBIA Rp to NB I-95' (1) ·
'PBIA to SB I-95 ' (1) ·
'SB I 95 Off Ramp ' (1) ·
'SB I-95 to PBIA ' (1) ·
'SR 811 to SB I 95 ' (1) ·
'SR-406 ' (1) ·
'SR804 E Ocean Ave.' (1) ·
'SR91 SB OFF RP81.9' (1) ·
'ST LUCIE W BLVD EB' (1) ·
'St. Johns Heritage' (1) ·
'SW 23RD AVE. ' (1) ·
'Tomoka Farms Rd ' (1) ·
'US-27 (SR-25) NB ' (1) ·
'US-27 (SR-25) SB ' (1)
700227 (1) ·
704190 (1) ·
790241 (1) ·
794045 (1) ·
794189 (1) ·
930302 (1) ·
930370 (1) ·
930437 (1) ·
930472 (1) ·
930481 (1) ·
930482 (1) ·
930483 (1) ·
930484 (1) ·
930485 (1) ·
930494 (1) ·
930512 (1) ·
930513 (1) ·
930526 (1) ·
931007 (1) ·
934167 (1) ·
934967 (1) ·
934969 (1) ·
949902 (1)
'0.1MI W OF BAYSHORE BLVD ' (1) ·
'0.25 MI N OF ATLANTIC AVE' (1) ·
'0.25 MI. W OF I-95 ' (1) ·
'0.9 Mi North of CR-4118 ' (1) ·
'1 Mile S of Boynton Inlet' (1) ·
'1.45 Mi W of Bee Line Hwy' (1) ·
'1.9 Mile E of US441 ' (1) ·
'1.9 Miles East of US-441 ' (1) ·
'2.0 MI N of US-92 on I-95' (1) ·
'2.9 Miles South of US-192' (1) ·
'5 mi. N Broward Co. line ' (1) ·
'Atlantic Ave./Fl. Tpk. ' (1) ·
'Bellevue Avenue over I-95' (1) ·
'North of Belvedere Rd ' (1) ·
'NW quad SR811/786 intchge' (1) ·
'PBIA/I-95 Interchange ' (1) ·
'SB Ramp to WPB Airport ' (1) ·
'SE quadrant PB Int Airprt' (1) ·
'SR-406 over Indian River ' (1)
26234852 (1) ·
26234905 (1) ·
26243156 (1) ·
26243157 (1) ·
26271300 (1) ·
26272647 (1) ·
26302699 (1) ·
26313736 (1) ·
26403501 (1) ·
26412225 (1) ·
26412326 (1) ·
26412375 (1) ·
26412530 (1) ·
26413650 (1) ·
26413700 (1) ·
26483998 (1) ·
26504915 (1) ·
27190373 (1) ·
28024500 (1) ·
28371291 (1) ·
29032507 (1) ·
29100400 (1) ·
29115274 (1)
80031431 (1) ·
80040300 (1) ·
80040450 (1) ·
80040574 (1) ·
80040575 (1) ·
80041000 (1) ·
80041660 (1) ·
80044341 (1) ·
80051470 (1) ·
80054615 (1) ·
80101536 (1) ·
80101850 (1) ·
80103080 (1) ·
80103466 (1) ·
80103494 (1) ·
80222756 (1) ·
80350835 (1) ·
80350917 (1) ·
80448000 (1) ·
80475557 (1) ·
81040678 (1) ·
81045800 (1) ·
81054486 (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 23 results in range #1 to #23.