Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-51 Canal ' (1) ·
'Cabana Colony Circle ' (1) ·
'Drainage Canal ' (1) ·
'E-2W CANAL ' (1) ·
'East Indian River Relief' (1) ·
'Fla. Turnpike & 2 canals' (1) ·
'I 95 & CSXRR & Canal ' (1) ·
'I-95 Ramps & CSXRR ' (1) ·
'I-95 Rmp A C D G & CSXRR' (1) ·
'INTRACOASTAL WATERWAY ' (1) ·
'Kyoto Gardens Dr ' (1) ·
'LITTLE MUD CREEK ' (1) ·
'LWDD L-14 Cnl ' (1) ·
'Mercer Ave and CSX RR ' (1) ·
'Mercer Ave./CSX RR/Canal' (1) ·
'N Fork Loxahatchee River' (1) ·
'Ramps A G & C.S.X. RR ' (1) ·
'Ramps A&G/BelvedereRd/RR' (1) ·
'Reed Canal ' (1) ·
'SR-9 (I-95) ' (1) ·
'Trib to Spruce Creek ' (1) ·
'West Indian River Relief' (1)
'Belvede to NB I-95' (1) ·
'CR-708 ' (1) ·
'CR-812 OCEAN AVE ' (1) ·
'East Island Access' (1) ·
'EBSR80 to SBSR807 ' (1) ·
'Haverhill Rd ' (1) ·
'Lantern Park Drive' (1) ·
'NB I-95 to PBIA R ' (1) ·
'Oak Lea Drive ' (1) ·
'PBIA Rp to NB I-95' (1) ·
'PBIA to SB I-95 ' (1) ·
'Prosperity Farms R' (1) ·
'SB I 95 Off Ramp ' (1) ·
'SB I-95 to PBIA ' (1) ·
'Spanish River Blvd' (1) ·
'SR 811 to SB I 95 ' (1) ·
'SR A1A ' (1) ·
'SR91 SB OFF RP81.9' (1) ·
'St Lucie West Blvd' (1) ·
'TEQUESTA DRIVE ' (1) ·
'Tomoka Farms Rd ' (1) ·
'WB Forest Hill Bld' (1) ·
'West Island Access' (1)
794045 (1) ·
796548 (1) ·
796549 (1) ·
890148 (1) ·
890149 (1) ·
894064 (1) ·
930472 (1) ·
930481 (1) ·
930482 (1) ·
930483 (1) ·
930484 (1) ·
930485 (1) ·
930494 (1) ·
930514 (1) ·
930526 (1) ·
930552 (1) ·
931007 (1) ·
934178 (1) ·
934359 (1) ·
934369 (1) ·
936776 (1) ·
940133 (1) ·
940158 (1)
'0.25 MI N OF ATLANTIC AVE' (1) ·
'0.3 Mile East of US-1 ' (1) ·
'0.4MI S of Melaleuca Ln ' (1) ·
'0.8Mi. N of PGA Blvd. ' (1) ·
'0.9 Mi North of CR-4118 ' (1) ·
'1.2MI. W of US-1 ' (1) ·
'1.7 miles east of SR 7 ' (1) ·
'1.7 Miles West of I-95 ' (1) ·
'10ft. S/O Reed Canal Rd ' (1) ·
'5.5mi. S of SR70 / I-95 ' (1) ·
'CR-4078 & Lantern Park Dr' (1) ·
'East of Ernest Lyons Bri.' (1) ·
'North of Belvedere Rd ' (1) ·
'NORTH OF BLIND CREEK ' (1) ·
'NW quad SR811/786 intchge' (1) ·
'PBIA/I-95 Interchange ' (1) ·
'SB Ramp to WPB Airport ' (1) ·
'SE quadrant PB Int Airprt' (1) ·
'Spanish R & I95 Csxrr Can' (1) ·
'West of Ernest Lyons Bri.' (1)
26230988 (1) ·
26272647 (1) ·
26350300 (1) ·
26361478 (1) ·
26390300 (1) ·
26403501 (1) ·
26412225 (1) ·
26412326 (1) ·
26412375 (1) ·
26412530 (1) ·
26413650 (1) ·
26413700 (1) ·
26504915 (1) ·
26512009 (1) ·
26572884 (1) ·
27025170 (1) ·
27121600 (1) ·
27123400 (1) ·
27184103 (1) ·
27224250 (1) ·
29032507 (1) ·
29093016 (1) ·
29093020 (1)
80024400 (1) ·
80040300 (1) ·
80040450 (1) ·
80040574 (1) ·
80040575 (1) ·
80041000 (1) ·
80041660 (1) ·
80041860 (1) ·
80051470 (1) ·
80054615 (1) ·
80061282 (1) ·
80061969 (1) ·
80072023 (1) ·
80102700 (1) ·
80103466 (1) ·
80111100 (1) ·
80115000 (1) ·
80151030 (1) ·
80152060 (1) ·
80245322 (1) ·
81001126 (1) ·
81002450 (1) ·
81040678 (1)
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 23 results in range #1 to #23.