Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'16th St/College Ln' (1) ·
'Benoist Farms Rd ' (1) ·
'Congress Avenue ' (1) ·
'CR605 Old Dixie ' (1) ·
'EB SR 786 ' (1) ·
'Hagen Ranch Road ' (1) ·
'Levee Road ' (1) ·
'LYONS ROAD ' (1) ·
'Park Road ' (1) ·
'SB I 95 SR 9 ' (1) ·
'SW Wood St. ' (1) ·
'Trailwood Drive ' (1) ·
'W/B Atlantic Ave ' (1) ·
'Wilden Road ' (1)
704085 (1) ·
796414 (1) ·
884084 (1) ·
884086 (1) ·
890800 (1) ·
930184 (1) ·
930440 (1) ·
930491 (1) ·
930528 (1) ·
930801 (1) ·
930805 (1) ·
930806 (1) ·
934711 (1) ·
934731 (1) ·
934958 (1)
'0.1 mi W of Fleming Grant' (1) ·
'0.2 MI West of US-98 ' (1) ·
'0.25Mi S/O Wiltshire Blvd' (1) ·
'1 mile S of Linton Blvd ' (1) ·
'1.3 Mi. North of CR-606 ' (1) ·
'1st overpass east of I-95' (1) ·
'2.0 Miles N of SR-806 ' (1) ·
'2.6MI W OF SEMINOLE PRATT' (1) ·
'300FT East of CR-717 ' (1) ·
'4.0 MI NW OF US-441 ' (1) ·
'Atlantic Ave./Fl. Tpk. ' (1) ·
'Benoist Farms Rd at SR-80' (1) ·
'Between SR704 and 12th St' (1) ·
'Inter 66th Ave/College Ln' (1) ·
'LYONS ROAD SOUTH OF SR-80' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 15 results in range #1 to #15.