Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-51 Canal ' (1) ·
'Cambridge Canal ' (1) ·
'E-2W Canal ' (1) ·
'G-370 East Inflow Canal ' (1) ·
'G-370 West Inflow Canal ' (1) ·
'I-95 ' (1) ·
'Indian River ' (1) ·
'Intracoastal Waterway ' (1) ·
'L-10 Canal ' (1) ·
'L-12 Canal ' (1) ·
'LWDD E-2E Canal ' (1) ·
'LWDD E-2W CANAL ' (1) ·
'LWDD E-4 CANAL ' (1) ·
'Northlake Blvd. WB ' (1) ·
'Platt Ranch Access Road ' (1) ·
'S-135 Canal ' (1) ·
'Sebastian Canal East ' (1) ·
'SR-91 (FL TURNPIKE) ' (1)
'Bellevue Avenue ' (1) ·
'CLINT MOORE RD EB ' (1) ·
'CLINT MOORE RD. EB' (1) ·
'Dunn Avenue ' (1) ·
'E/B Atlantic Ave. ' (1) ·
'Levee Road ' (1) ·
'Loxahatchee Slough' (1) ·
'Park Road ' (1) ·
'SR-406 ' (1) ·
'SR804 E Ocean Ave.' (1) ·
'ST LUCIE W BLVD EB' (1) ·
'St. Johns Heritage' (1) ·
'SW 23RD AVE. ' (1) ·
'SW Wood St. ' (1) ·
'Trailwood Drive ' (1) ·
'US-27 (SR-25) NB ' (1) ·
'US-27 (SR-25) SB ' (1) ·
'Wilden Road ' (1)
700227 (1) ·
704085 (1) ·
704190 (1) ·
790241 (1) ·
794189 (1) ·
796414 (1) ·
890800 (1) ·
930302 (1) ·
930370 (1) ·
930437 (1) ·
930512 (1) ·
930513 (1) ·
930801 (1) ·
930805 (1) ·
930806 (1) ·
934167 (1) ·
934967 (1) ·
934969 (1) ·
949902 (1)
'0.1 mi W of Fleming Grant' (1) ·
'0.1MI W OF BAYSHORE BLVD ' (1) ·
'0.2 MI West of US-98 ' (1) ·
'0.25 MI. W OF I-95 ' (1) ·
'0.25Mi S/O Wiltshire Blvd' (1) ·
'1 Mile S of Boynton Inlet' (1) ·
'1.45 Mi W of Bee Line Hwy' (1) ·
'1.9 Mile E of US441 ' (1) ·
'1.9 Miles East of US-441 ' (1) ·
'2.0 MI N of US-92 on I-95' (1) ·
'2.6MI W OF SEMINOLE PRATT' (1) ·
'2.9 Miles South of US-192' (1) ·
'300FT East of CR-717 ' (1) ·
'4.0 MI NW OF US-441 ' (1) ·
'5 mi. N Broward Co. line ' (1) ·
'Atlantic Ave./Fl. Tpk. ' (1) ·
'Bellevue Avenue over I-95' (1) ·
'SR-406 over Indian River ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 19 results in range #1 to #19.