Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-51 Canal ' (1) ·
'Cabana Colony Circle ' (1) ·
'Cambridge Canal ' (1) ·
'Drainage Canal ' (1) ·
'East Indian River Relief' (1) ·
'Fla. Turnpike & 2 canals' (1) ·
'I 95 & CSXRR & Canal ' (1) ·
'INTRACOASTAL WATERWAY ' (1) ·
'L-10 Canal ' (1) ·
'L-12 Canal ' (1) ·
'LITTLE MUD CREEK ' (1) ·
'LWDD L-14 Cnl ' (1) ·
'N Fork Loxahatchee River' (1) ·
'Reed Canal ' (1) ·
'S-135 Canal ' (1) ·
'Sebastian Canal East ' (1) ·
'SR-9 (I-95) ' (1) ·
'West Indian River Relief' (1)
'CR-708 ' (1) ·
'CR-812 OCEAN AVE ' (1) ·
'East Island Access' (1) ·
'Haverhill Rd ' (1) ·
'Lantern Park Drive' (1) ·
'Levee Road ' (1) ·
'Oak Lea Drive ' (1) ·
'Park Road ' (1) ·
'Prosperity Farms R' (1) ·
'Spanish River Blvd' (1) ·
'SR A1A ' (1) ·
'St Lucie West Blvd' (1) ·
'SW Wood St. ' (1) ·
'TEQUESTA DRIVE ' (1) ·
'Trailwood Drive ' (1) ·
'WB Forest Hill Bld' (1) ·
'West Island Access' (1) ·
'Wilden Road ' (1)
704085 (1) ·
796414 (1) ·
796548 (1) ·
796549 (1) ·
890148 (1) ·
890149 (1) ·
890800 (1) ·
894064 (1) ·
930514 (1) ·
930552 (1) ·
930801 (1) ·
930805 (1) ·
930806 (1) ·
934178 (1) ·
934359 (1) ·
934369 (1) ·
936776 (1) ·
940133 (1) ·
940158 (1)
'0.1 mi W of Fleming Grant' (1) ·
'0.2 MI West of US-98 ' (1) ·
'0.25Mi S/O Wiltshire Blvd' (1) ·
'0.3 Mile East of US-1 ' (1) ·
'0.4MI S of Melaleuca Ln ' (1) ·
'0.8Mi. N of PGA Blvd. ' (1) ·
'1.2MI. W of US-1 ' (1) ·
'1.7 miles east of SR 7 ' (1) ·
'1.7 Miles West of I-95 ' (1) ·
'10ft. S/O Reed Canal Rd ' (1) ·
'2.6MI W OF SEMINOLE PRATT' (1) ·
'300FT East of CR-717 ' (1) ·
'4.0 MI NW OF US-441 ' (1) ·
'5.5mi. S of SR70 / I-95 ' (1) ·
'CR-4078 & Lantern Park Dr' (1) ·
'East of Ernest Lyons Bri.' (1) ·
'NORTH OF BLIND CREEK ' (1) ·
'Spanish R & I95 Csxrr Can' (1) ·
'West of Ernest Lyons Bri.' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 19 results in range #1 to #19.