Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BELCHER C-25 CANAL ' (1) ·
'C-51 Canal ' (1) ·
'Cambridge Canal ' (1) ·
'Halifax Canal ' (1) ·
'HAULOVER CANAL ' (1) ·
'L-10 Canal ' (1) ·
'L-12 Canal ' (1) ·
'L.W.D.D. #9 ' (1) ·
'N CANAL ' (1) ·
'PERENNIAL CANAL ' (1) ·
'RCA Center Dr & FEC R/R ' (1) ·
'Rowland Canal ' (1) ·
'S-135 Canal ' (1) ·
'Sebastian Canal East ' (1) ·
'SR 91 TPK ' (1) ·
INDIAN RIVER (1) ·
SR-401 (1)
'COURTENAY PARKWAY ' (1) ·
'CR68 ORNG AV 156.1' (1) ·
'DAVIS ROAD ' (1) ·
'Daytona Avenue ' (1) ·
'KEENE ROAD/CR-611 ' (1) ·
'Levee Road ' (1) ·
'PARK COMMERCE BLVD' (1) ·
'Park Road ' (1) ·
'SR 811 to SB I-95 ' (1) ·
'SW Wood St. ' (1) ·
'Trailwood Drive ' (1) ·
'VANDEGRIFT-WILL RD' (1) ·
'West Farms Road ' (1) ·
'Wilden Road ' (1) ·
NASA CAUSEWAY EB (1) ·
NASA CAUSEWAY WB (1) ·
Overpass Ramp (1)
700218 (1) ·
703001 (1) ·
703002 (1) ·
703004 (1) ·
704085 (1) ·
795504 (1) ·
796414 (1) ·
890800 (1) ·
894056 (1) ·
930493 (1) ·
930801 (1) ·
930805 (1) ·
930806 (1) ·
934506 (1) ·
936500 (1) ·
937202 (1) ·
940056 (1) ·
944014 (1)
'0.02 MI S/O LPGA Blvd ' (1) ·
'0.1 mi W of Fleming Grant' (1) ·
'0.2 MI West of US-98 ' (1) ·
'0.25Mi S/O Wiltshire Blvd' (1) ·
'0.4 MILE N OF SR-710 ' (1) ·
'0.8 MILE N OF 10TH AVE N ' (1) ·
'1.0 Mile West of SR-710 ' (1) ·
'1MILE E OF HATTON HWY ' (1) ·
'2.6MI W OF SEMINOLE PRATT' (1) ·
'2.9 MI N OF SR-70 ' (1) ·
'300FT East of CR-717 ' (1) ·
'4.0 MI NW OF US-441 ' (1) ·
'8.6 MILES SOUTH OF US 1 ' (1) ·
'At ANGLE RD(CR-607A) ' (1) ·
'NW quad SR811/786 intchge' (1) ·
0.7 Mile N of SR-528 (1) ·
KENNEDY SPACE CENTER (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 18 results in range #1 to #18.