Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Bear Wildlife Crossing ' (1) ·
'Cougar Wildlife Crossing' (1) ·
'Deer Wildlife Crossing ' (1) ·
'EB SR80 & C-51 Canal ' (1) ·
'Haverhill Rd. & U Turns ' (1) ·
'I-95 ' (1) ·
'ICWW ' (1) ·
'Jog Rd. & Turn Arounds ' (1) ·
'PAHOKEE DRAIN CANAL M-2 ' (1) ·
'S. R. 7 & Return Ramps ' (1) ·
'SR 809 (Military Trail) ' (1) ·
'SR-91 TPK(GLADES RD INT)' (1) ·
'ST LUCIE CANAL ' (1) ·
'St. Lucie River/SR-707 ' (1) ·
'US-17-92 -St Johns River' (1) ·
'US-17-92-St Johns River ' (1) ·
'WB SR 80 ' (1)
'HATTON HIGHWAY ' (1) ·
'I-4 EB ' (1) ·
'I-4 WB ' (1) ·
'NB SR 807 ' (1) ·
'Pineda Causeway ' (1) ·
'SB SR 807 ' (1) ·
'SB US-1/SR-5 ' (1) ·
'SR 400 WB ' (1) ·
'SR 80-Southern Bvd' (1) ·
'SR 80/Southern Bld' (1) ·
'SR 80/Southern Bvd' (1) ·
'SR 91 TPK SB 131.0' (1) ·
'SR-400 ' (1) ·
'SR-A1A (Ocean Ave)' (1) ·
'SR91SB ON/OFF 76.4' (1)
700225 (1) ·
790196 (1) ·
790197 (1) ·
790205 (1) ·
790207 (1) ·
790247 (1) ·
890066 (1) ·
890150 (1) ·
890151 (1) ·
930450 (1) ·
930457 (1) ·
930459 (1) ·
930475 (1) ·
930476 (1) ·
930525 (1) ·
930527 (1) ·
930532 (1) ·
930533 (1) ·
934553 (1)
'1.2MI S OF US-98 ' (1) ·
'1mi S of SR-707 on SR-5 ' (1) ·
'2 miles west of Turnpike ' (1) ·
'2.6 MI S of Wickham Rd. ' (1) ·
'3.7MI S/O STUART INT. ' (1) ·
'4.03Miles E of SR5 on A1A' (1) ·
'BOCA RATON INTERCHNG #28 ' (1) ·
'E Jog Rd. & W SR 80 ' (1) ·
'East Tpk & West SR 809 ' (1) ·
'i-4 WB - Cougar Crossing ' (1) ·
'I-4 WB over Bear Crossing' (1) ·
'I-4EB-US-17-92 St Johns R' (1) ·
'I-4WB-US-17-92 St Johns R' (1) ·
'SE quadrant PB Int Airpt ' (1) ·
'SR 400 WB over Deer Wildl' (1) ·
'SW quadrant PB Int Airprt' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
10930 (1) ·
122864 (1) ·
125788 (1) ·
130993 (1) ·
137065 (1) ·
23943 (1) ·
25331 (1) ·
28628 (1) ·
38517 (1) ·
50315 (1) ·
51900 (1) ·
88900 (1) ·
95425 (1) ·
963 (1)
Showing below up to 19 results in range #1 to #19.