Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'E-2W Canal ' (1) ·
'FTPK & S Macedo Blvd. ' (1) ·
'G-370 East Inflow Canal ' (1) ·
'G-370 West Inflow Canal ' (1) ·
'I-95 ' (1) ·
'Indian River ' (1) ·
'Intracoastal Waterway ' (1) ·
'Lateral H Canal ' (1) ·
'LWDD E-2E Canal ' (1) ·
'LWDD E-2W CANAL ' (1) ·
'LWDD E-4 CANAL ' (1) ·
'Northlake Blvd. WB ' (1) ·
'Platt Ranch Access Road ' (1) ·
'SR-40 ' (1) ·
'SR-91 (FL TURNPIKE) ' (1) ·
'US-192 ' (1) ·
Addison Canal (1) ·
Wickham Road (1)
'53rd Street ' (1) ·
'Bellevue Avenue ' (1) ·
'CLINT MOORE RD EB ' (1) ·
'CLINT MOORE RD. EB' (1) ·
'Crosstown Parkway ' (1) ·
'Dunn Avenue ' (1) ·
'E/B Atlantic Ave. ' (1) ·
'I-95 ' (1) ·
'Loxahatchee Slough' (1) ·
'SR-406 ' (1) ·
'SR804 E Ocean Ave.' (1) ·
'ST LUCIE W BLVD EB' (1) ·
'St. Johns Heritage' (1) ·
'SW 23RD AVE. ' (1) ·
'US-27 (SR-25) NB ' (1) ·
'US-27 (SR-25) SB ' (1) ·
I-95 (1)
700209 (1) ·
700222 (1) ·
700227 (1) ·
700229 (1) ·
704190 (1) ·
790193 (1) ·
790241 (1) ·
794189 (1) ·
884083 (1) ·
930302 (1) ·
930370 (1) ·
930437 (1) ·
930512 (1) ·
930513 (1) ·
934167 (1) ·
934967 (1) ·
934969 (1) ·
944018 (1) ·
949902 (1)
'0.1MI W OF BAYSHORE BLVD ' (1) ·
'0.1Mi. E of Bayshore Blvd' (1) ·
'0.25 MI. W OF I-95 ' (1) ·
'1 Mile S of Boynton Inlet' (1) ·
'1.45 Mi W of Bee Line Hwy' (1) ·
'1.6 Miles East of 58th Av' (1) ·
'1.9 Mile E of US441 ' (1) ·
'1.9 Miles East of US-441 ' (1) ·
'2.0 MI N of US-92 on I-95' (1) ·
'2.9 Miles South of US-192' (1) ·
'5 mi. N Broward Co. line ' (1) ·
'Atlantic Ave./Fl. Tpk. ' (1) ·
'Bellevue Avenue over I-95' (1) ·
'I-95 over SR-40 ' (1) ·
'I-95 over US-192 ' (1) ·
'SR-406 over Indian River ' (1) ·
I-95 over Addison Canal (1) ·
I-95 over Wickham Road (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 19 results in range #1 to #19.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)