Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'E-2W Canal ' (1) ·
'FL TPK (SR-91) ' (1) ·
'G-370 East Inflow Canal ' (1) ·
'G-370 West Inflow Canal ' (1) ·
'I 95 SR 9 ' (1) ·
'I-4 ' (1) ·
'I-95 ' (1) ·
'Indian River ' (1) ·
'Intracoastal Waterway ' (1) ·
'Lateral D Canal ' (1) ·
'LWDD E-2E Canal ' (1) ·
'LWDD E-2W CANAL ' (1) ·
'LWDD E-4 CANAL ' (1) ·
'Main Relief Canal ' (1) ·
'Northlake Blvd. WB ' (1) ·
'Platt Ranch Access Road ' (1) ·
'SR 91 TPK (PGA BV INT) ' (1) ·
'SR-91 (FL TURNPIKE) ' (1)
'66th Avenue ' (1) ·
'Bellevue Avenue ' (1) ·
'CLINT MOORE RD EB ' (1) ·
'CLINT MOORE RD. EB' (1) ·
'CR-609 (82nd Ave.)' (1) ·
'Dunn Avenue ' (1) ·
'E/B Atlantic Ave. ' (1) ·
'EB US 98 SR 80 ' (1) ·
'Enterprise Rd. ' (1) ·
'Loxahatchee Slough' (1) ·
'Roebuck Road ' (1) ·
'SR-406 ' (1) ·
'SR804 E Ocean Ave.' (1) ·
'SR91 NB TPK 109.5 ' (1) ·
'ST LUCIE W BLVD EB' (1) ·
'St. Johns Heritage' (1) ·
'SW 23RD AVE. ' (1) ·
'US-27 (SR-25) NB ' (1) ·
'US-27 (SR-25) SB ' (1) ·
'WB US 98 SR 80 ' (1)
700227 (1) ·
704190 (1) ·
790191 (1) ·
790241 (1) ·
794189 (1) ·
884098 (1) ·
884099 (1) ·
930302 (1) ·
930370 (1) ·
930437 (1) ·
930462 (1) ·
930512 (1) ·
930513 (1) ·
930539 (1) ·
931013 (1) ·
934167 (1) ·
934283 (1) ·
934967 (1) ·
934969 (1) ·
949902 (1)
'0.1MI W OF BAYSHORE BLVD ' (1) ·
'0.25 MI. W OF I-95 ' (1) ·
'0.7Mi South of SR-60 ' (1) ·
'1 Mile S of Boynton Inlet' (1) ·
'1.0 Mi West of Haverhill ' (1) ·
'1.45 Mi W of Bee Line Hwy' (1) ·
'1.9 Mi South of SR-60 ' (1) ·
'1.9 Mile E of US441 ' (1) ·
'1.9 Miles East of US-441 ' (1) ·
'2.0 MI N of US-92 on I-95' (1) ·
'2.9 Miles South of US-192' (1) ·
'5 mi. N Broward Co. line ' (1) ·
'Atlantic Ave./Fl. Tpk. ' (1) ·
'Bellevue Avenue over I-95' (1) ·
'Enterprise Rd. Over I-4 ' (1) ·
'Palm Beach Garden Interch' (1) ·
'SR 80 / I-95 Interchange ' (1) ·
'SR-406 over Indian River ' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 20 results in range #1 to #20.