Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Cabana Colony Circle ' (1) ·
'Drainage Canal ' (1) ·
'East Indian River Relief' (1) ·
'Fla. Turnpike & 2 canals' (1) ·
'I 95 & CSXRR & Canal ' (1) ·
'INTRACOASTAL WATERWAY ' (1) ·
'LITTLE MUD CREEK ' (1) ·
'LOXAHATCHEE RIVER ' (1) ·
'LWDD L-14 Cnl ' (1) ·
'N Fork Loxahatchee River' (1) ·
'Reed Canal ' (1) ·
'SR-9 (I-95) ' (1) ·
'West Indian River Relief' (1)
'CR-708 ' (1) ·
'CR-812 OCEAN AVE ' (1) ·
'East Island Access' (1) ·
'Haverhill Rd ' (1) ·
'I 95 SR 9 ' (1) ·
'Lantern Park Drive' (1) ·
'Oak Lea Drive ' (1) ·
'Prosperity Farms R' (1) ·
'Spanish River Blvd' (1) ·
'SR A1A ' (1) ·
'St Lucie West Blvd' (1) ·
'TEQUESTA DRIVE ' (1) ·
'WB Forest Hill Bld' (1) ·
'West Island Access' (1)
796548 (1) ·
796549 (1) ·
890148 (1) ·
890149 (1) ·
894064 (1) ·
930375 (1) ·
930514 (1) ·
930552 (1) ·
934178 (1) ·
934359 (1) ·
934369 (1) ·
936776 (1) ·
940133 (1) ·
940158 (1)
'0.3 Mile East of US-1 ' (1) ·
'0.4MI S of Melaleuca Ln ' (1) ·
'0.8Mi. N of PGA Blvd. ' (1) ·
'1.2MI. W of US-1 ' (1) ·
'1.7 miles east of SR 7 ' (1) ·
'1.7 miles North of SR 706' (1) ·
'1.7 Miles West of I-95 ' (1) ·
'10ft. S/O Reed Canal Rd ' (1) ·
'5.5mi. S of SR70 / I-95 ' (1) ·
'CR-4078 & Lantern Park Dr' (1) ·
'East of Ernest Lyons Bri.' (1) ·
'NORTH OF BLIND CREEK ' (1) ·
'Spanish R & I95 Csxrr Can' (1) ·
'West of Ernest Lyons Bri.' (1)
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 14 results in range #1 to #14.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)