Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BELCHER C-25 CANAL ' (1) ·
'Burns Road ' (1) ·
'C-18 Canal ' (1) ·
'C-3 Canal ' (1) ·
'CR 782 Linton Blvd ' (1) ·
'E-1 Canal ' (1) ·
'Halifax Canal ' (1) ·
'HAULOVER CANAL ' (1) ·
'L.W.D.D. #9 ' (1) ·
'Lake Ida Road ' (1) ·
'LOXAHATCHEE CREEK ' (1) ·
'M-1 CANAL ' (1) ·
'N CANAL ' (1) ·
'Palm Beach Lake Blvd ' (1) ·
'Palm Beach Lakes Blvd. ' (1) ·
'PERENNIAL CANAL ' (1) ·
'RCA Center Dr & FEC R/R ' (1) ·
'Rowland Canal ' (1) ·
'SR 806 (Atlantic Ave.) ' (1) ·
'SR 91 TPK ' (1) ·
INDIAN RIVER (1) ·
SR-401 (1)
'COURTENAY PARKWAY ' (1) ·
'CR68 ORNG AV 156.1' (1) ·
'CRESTWOOD BLVD. N ' (1) ·
'DAVIS ROAD ' (1) ·
'Daytona Avenue ' (1) ·
'I 95 SR 9 NB ' (1) ·
'I 95 SR 9 SB ' (1) ·
'Island Way ' (1) ·
'KEENE ROAD/CR-611 ' (1) ·
'Lake Ida Road ' (1) ·
'NB I 95 SR 9 ' (1) ·
'NB I-95 (S.R.9) ' (1) ·
'NB I-95 (SR 9) ' (1) ·
'PARK COMMERCE BLVD' (1) ·
'SB I 95 SR 9 ' (1) ·
'SR 811 to SB I-95 ' (1) ·
'SR91 N/S TPK 117.5' (1) ·
'Stribling Way ' (1) ·
'VANDEGRIFT-WILL RD' (1) ·
'West Farms Road ' (1) ·
NASA CAUSEWAY EB (1) ·
NASA CAUSEWAY WB (1) ·
Overpass Ramp (1)
700218 (1) ·
703001 (1) ·
703002 (1) ·
703004 (1) ·
795504 (1) ·
894056 (1) ·
930241 (1) ·
930493 (1) ·
930495 (1) ·
930499 (1) ·
930500 (1) ·
930504 (1) ·
930521 (1) ·
930530 (1) ·
930531 (1) ·
934177 (1) ·
934301 (1) ·
934506 (1) ·
934963 (1) ·
936500 (1) ·
937202 (1) ·
937367 (1) ·
940056 (1) ·
944014 (1)
'0.02 MI S/O LPGA Blvd ' (1) ·
'0.14MI N of Indiantown Rd' (1) ·
'0.2 MI S OF MARTIN CO LIN' (1) ·
'0.3MI W OF ROYAL PALM BL ' (1) ·
'0.4 MILE N OF SR-710 ' (1) ·
'0.8 MILE N OF 10TH AVE N ' (1) ·
'1 mile North of SR 704 ' (1) ·
'1.0 Mile West of SR-710 ' (1) ·
'1.5 miles South of SR 806' (1) ·
'1Mi E of CR809/Military T' (1) ·
'1MILE E OF HATTON HWY ' (1) ·
'2.9 MI N OF SR-70 ' (1) ·
'8.6 MILES SOUTH OF US 1 ' (1) ·
'At ANGLE RD(CR-607A) ' (1) ·
'Between N Lake/PGA Blvds.' (1) ·
'E Congress Ave & N SR 806' (1) ·
'I-95/SR 806 interchange ' (1) ·
'NW quad SR811/786 intchge' (1) ·
'StriblingWay ovr E-1canal' (1) ·
0.7 Mile N of SR-528 (1) ·
KENNEDY SPACE CENTER (1)
26262220 (1) ·
26274100 (1) ·
26281695 (1) ·
26282306 (1) ·
26380939 (1) ·
26382390 (1) ·
26430765 (1) ·
26430835 (1) ·
26434195 (1) ·
26442375 (1) ·
26494986 (1) ·
26504600 (1) ·
26535784 (1) ·
26561000 (1) ·
26571548 (1) ·
27011700 (1) ·
27265121 (1) ·
27281131 (1) ·
28250000 (1) ·
28313826 (1) ·
28313884 (1) ·
28441095 (1) ·
29144552 (1)
80051800 (1) ·
80052000 (1) ·
80052100 (1) ·
80052215 (1) ·
80052285 (1) ·
80054600 (1) ·
80054760 (1) ·
80054982 (1) ·
80062196 (1) ·
80082400 (1) ·
80095581 (1) ·
80121322 (1) ·
80135529 (1) ·
80162888 (1) ·
80225738 (1) ·
80253838 (1) ·
80285590 (1) ·
80321756 (1) ·
80375599 (1) ·
80451679 (1) ·
80454983 (1) ·
81022149 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
None (1) ·
10800 (1) ·
11958 (1) ·
121 (1) ·
1388 (1) ·
1454 (1) ·
148776 (1) ·
1735 (1) ·
176174 (1) ·
181308 (1) ·
184778 (1) ·
23422 (1) ·
288 (1) ·
3470 (1) ·
4001 (1) ·
4414 (1) ·
46846 (1) ·
5500 (1) ·
77034 (1)
Showing below up to 24 results in range #1 to #24.