Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Australian Ave and Canal' (1) ·
'Australian Avenue ' (1) ·
'C-52 Canal ' (1) ·
'George King Blvd ' (1) ·
'Goat Creek ' (1) ·
'Habitat Connectivity ' (1) ·
'I-4 ' (1) ·
'KELLER CANAL ' (1) ·
'L-78 Borrow Canal ' (1) ·
'Loxahatchee Slough ' (1) ·
'Miami Canal L-25 ' (1) ·
'Rose Bay ' (1) ·
'Spruce Creek ' (1) ·
'Spruce Creek N. Relief ' (1) ·
'Spruce Creek S. Relief ' (1) ·
'St. Johns Marsh ' (1) ·
'Turnbull Creek ' (1) ·
George King Blvd (1) ·
Sawgrass Creek (1) ·
St Johns River Relief (1) ·
St. Johns River (1)
'CENTER DRIVE ' (1) ·
'CR-4139 ' (1) ·
'EB SR-710 ' (1) ·
'I 95 to PBIA Ramp ' (1) ·
'PBIA to I-95 Ramp ' (1) ·
'SR-40 EB ' (1) ·
'SR-60 EB ' (1) ·
'SR-60 WB ' (1) ·
'SR-A1A NB ' (1) ·
'US-1 NB ' (1) ·
'US-1 SB ' (1) ·
'US-27/SR-80 SB ' (1) ·
'WB SR-710 ' (1) ·
SR-A1A SB (1) ·
US-192 EB (1) ·
US-192 WB (1)
700204 (1) ·
700205 (1) ·
700210 (1) ·
700211 (1) ·
700212 (1) ·
700213 (1) ·
700214 (1) ·
790156 (1) ·
790158 (1) ·
790160 (1) ·
790161 (1) ·
790195 (1) ·
790212 (1) ·
790217 (1) ·
880091 (1) ·
880094 (1) ·
880096 (1) ·
930479 (1) ·
930480 (1) ·
930535 (1) ·
930536 (1) ·
930538 (1) ·
934357 (1)
'10.3Mi. E of SR-91 (TPK) ' (1) ·
'11.6Mi. E of SR-91 (TPK) ' (1) ·
'2 miles East of SR-786 ' (1) ·
'2 miles East of SR786 ' (1) ·
'2Mi. West of CR-512 ' (1) ·
'At John Stretch Park ' (1) ·
'CR-4139 over I-4 ' (1) ·
'IN JOHN PRINCE PARK ' (1) ·
'PBIA/I-95 Interchange ' (1) ·
'SR-40EB - Habitat Connect' (1) ·
'SR-A1A - George King Blvd' (1) ·
'US-1 NB - Spruce Cr. S. ' (1) ·
'US-1 NB - Spruce Creek ' (1) ·
'US-1 NB over Goat Creek ' (1) ·
'US-1 SB - Turnbull Creek ' (1) ·
'US-1 SB over Goat Creek ' (1) ·
'US-1 SB over Rose Bay ' (1) ·
SR-A1A SB- George King (1) ·
US-192 EB-St Johns Relief (1) ·
US-192 WB - Sawgrass Cr. (1) ·
US-192 WB- St Johns River (1)
26364799 (1) ·
26411352 (1) ·
26411700 (1) ·
26414539 (1) ·
26492016 (1) ·
26492039 (1) ·
27382573 (1) ·
27382910 (1) ·
27383040 (1) ·
27580607 (1) ·
27580636 (1) ·
28050547 (1) ·
28052963 (1) ·
28053134 (1) ·
28241290 (1) ·
28241322 (1) ·
28491498 (1) ·
29001448 (1) ·
29050250 (1) ·
29051110 (1) ·
29051931 (1) ·
29061303 (1) ·
29153158 (1)
80042465 (1) ·
80042805 (1) ·
80045351 (1) ·
80101483 (1) ·
80101580 (1) ·
80323926 (1) ·
80324008 (1) ·
80370688 (1) ·
80370748 (1) ·
80403784 (1) ·
80433190 (1) ·
80443870 (1) ·
80450403 (1) ·
80454978 (1) ·
80482471 (1) ·
80494825 (1) ·
80513613 (1) ·
80580170 (1) ·
80580651 (1) ·
80581106 (1) ·
80581931 (1) ·
81110743 (1) ·
81143187 (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures. (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 23 results in range #1 to #23.