Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'14TH STREET CANAL ' (1) ·
'Angle Rd - Belcher Canal' (1) ·
'Angle Rd.- Belcher Canal' (1) ·
'Berrys Canal ' (1) ·
'BESSEY CREEK ' (1) ·
'C-23 Canal ' (1) ·
'CYPRESS CREEK #2 ' (1) ·
'Galiano Rd. & C-24 Canal' (1) ·
'Header Canal ' (1) ·
'HUNGRYLAND CANAL C-18 ' (1) ·
'Intracoastal Waterway ' (1) ·
'IWW Halifax River ' (1) ·
'IWW Indian River ' (1) ·
'LATERAL CANAL #38 ' (1) ·
'LOXAHATCHEE WPB CANAL ' (1) ·
'PHIPP CANAL ' (1) ·
'South Relief Canal ' (1) ·
'SR 710 & SCL RR ' (1) ·
'SR 91 TPK ' (1) ·
'SR-91 (FL. TPK.) ' (1) ·
'US-1 & FECRR ' (1)
'CR-603-IND RIV BLV' (1) ·
'CR708 125.4 ' (1) ·
'Emerson Ave 27th A' (1) ·
'NB I-95 (SR-9) ' (1) ·
'NB I-95 (SR-9) ' (1) ·
'PALMETTO PARK ROAD' (1) ·
'SB I-95 (SR-9) ' (1) ·
'SR-44 ' (1) ·
'SR-76(Kanner Hwy )' (1) ·
'SR-A1A ' (1) ·
'SR91 N/S TPK 103.1' (1) ·
'SR91 N/S TPK 106.1' (1) ·
'SR91 N/S TPK 115.5' (1) ·
'SR91 N/S TPK 119.1' (1) ·
'SR91 N/S TPK 126.5' (1) ·
'SR91 N/S TPK 135.6' (1) ·
'SR91 N/S TPK 92.1 ' (1) ·
'US-1 (SR-5) ' (1) ·
'WB SR 70 ' (1)
790128 (1) ·
790148 (1) ·
790149 (1) ·
790152 (1) ·
880088 (1) ·
884054 (1) ·
890079 (1) ·
890082 (1) ·
890085 (1) ·
890111 (1) ·
890119 (1) ·
890126 (1) ·
930004 (1) ·
930159 (1) ·
930223 (1) ·
930235 (1) ·
930239 (1) ·
934908 (1) ·
940092 (1) ·
940093 (1) ·
940113 (1) ·
940119 (1)
'.25mi W OF I-95 ' (1) ·
'0.1 MILE WEST OF I-95 ' (1) ·
'0.8 MILE EAST OF US-1 ' (1) ·
'1 Mile South of SR-786 ' (1) ·
'1.0MI NORTH OF SR-708 ' (1) ·
'1.0MI SOUTH OF SR-706 ' (1) ·
'1.2 MI NO OF LANTANA RD ' (1) ·
'1.3 MI N OF PLM BCH CO LI' (1) ·
'1.3 MI N OF STUART INTRCH' (1) ·
'1.4MI NORTH OF US-1 ' (1) ·
'2 mi. N of Gatlin Blvd. ' (1) ·
'2.5 mi. N of SR 70 ' (1) ·
'2.8MI S OF SR-60 ' (1) ·
'2mi.N of SR714 on I95 ' (1) ·
'3.0 MI NORTH OF SR-704 ' (1) ·
'3.33 Miles S/O PGA BLVD ' (1) ·
'7.0 mi. W of FL Turnpike ' (1) ·
'SR-44 - Berrys Canal ' (1) ·
'SR-44 - Indian River ' (1) ·
'SR-44 over US-1 ' (1) ·
'SR-A1A over Halifax River' (1)
26210242 (1) ·
26360866 (1) ·
26450626 (1) ·
26474455 (1) ·
26495569 (1) ·
26554196 (1) ·
26581931 (1) ·
27023878 (1) ·
27033219 (1) ·
27061911 (1) ·
27102733 (1) ·
27121953 (1) ·
27172347 (1) ·
27222475 (1) ·
27281041 (1) ·
27281411 (1) ·
27355287 (1) ·
27373700 (1) ·
29011550 (1) ·
29012564 (1) ·
29014148 (1) ·
29085374 (1)
80033671 (1) ·
80043210 (1) ·
80075399 (1) ·
80080366 (1) ·
80090356 (1) ·
80102470 (1) ·
80104223 (1) ·
80142214 (1) ·
80142789 (1) ·
80155436 (1) ·
80184796 (1) ·
80224294 (1) ·
80240091 (1) ·
80245043 (1) ·
80251481 (1) ·
80252971 (1) ·
80254109 (1) ·
80295022 (1) ·
80550332 (1) ·
80551845 (1) ·
80553031 (1) ·
80583172 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 22 results in range #1 to #22.