Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'ANGLE RD & BELCHER CANAL' (1) ·
'Belcher Canal (C-25) ' (1) ·
'C-51 CANAL ' (1) ·
'CANAL L-12 ' (1) ·
'CANAL L-20 ' (1) ·
'Canal No. 1 ' (1) ·
'Canal No.1 ' (1) ·
'Danforth Creek ' (1) ·
'Drainage Canal Sand Cut ' (1) ·
'F.P.F.W.C.D. Canal No. 1' (1) ·
'Kings Road ' (1) ·
'LWDD E-1 CANAL ' (1) ·
'OUTFALL SLOUGH ' (1) ·
'S Fork St. Lucie River ' (1) ·
'Spruce Creek ' (1) ·
'Spruce Creek S. Relief ' (1) ·
'St Johns River Relief ' (1) ·
'Tomoka River ' (1)
'EB Martin Downs Bd' (1) ·
'FLYING COW ROAD ' (1) ·
'NB SR-615 ' (1) ·
'NEW ENGLAND BLVD ' (1) ·
'SB SR- 615 ' (1) ·
'SB SR-615 ' (1) ·
'SR-40 EB ' (1) ·
'SR-40 WB ' (1) ·
'SR-407 ' (1) ·
'SR-713 (Kings Hwy)' (1) ·
'SR-80 EB ' (1) ·
'SR-80 WB ' (1) ·
'SR91 NB TPK 157.9 ' (1) ·
'SR91 NB TPK 158.6 ' (1) ·
'SR91 NB TPK 178.03' (1) ·
'SR91 SB TPK 157.9 ' (1) ·
'SR91 SB TPK 158.6 ' (1) ·
'SR91 SB TPK 178.03' (1) ·
'Taylor Road ' (1) ·
'US-1 SB ' (1) ·
'US-192 WB ' (1) ·
'US98&441 SR700&15' (1) ·
'WB SR - 714 ' (1)
700023 (1) ·
700090 (1) ·
790027 (1) ·
790157 (1) ·
790163 (1) ·
794009 (1) ·
880058 (1) ·
880066 (1) ·
890038 (1) ·
890135 (1) ·
930091 (1) ·
930354 (1) ·
930355 (1) ·
934292 (1) ·
934904 (1) ·
940057 (1) ·
940058 (1) ·
940073 (1) ·
940083 (1) ·
940143 (1) ·
940146 (1) ·
940147 (1) ·
940148 (1) ·
940149 (1)
'.5mi So. of St Lucie Blvd' (1) ·
'0.1MI E OF US-441 SR-7 ' (1) ·
'0.2 mi E of CR-415 ' (1) ·
'1.5 mi N of SR 68 ' (1) ·
'1.5 mi. N. of SR 68 ' (1) ·
'1.83 MILES N OF SR-68 ' (1) ·
'15 MI S OF SR 60 ' (1) ·
'15 MI SOUTH OF SR 60 ' (1) ·
'16Mi W of SR-7 ' (1) ·
'2 mi N. of SR 68 ' (1) ·
'2 Mi. N. of SR 68 ' (1) ·
'2.5 mi East of TPK Exit ' (1) ·
'2.5 MI NORTH OF SR-68 ' (1) ·
'2.53 MI NORTH OF SR-68 ' (1) ·
'2.9 Mi East of SR-528 ' (1) ·
'4.1Mi N of WPB Canal ' (1) ·
'AT SR-80 ' (1) ·
'SR-40 EB - Tomoka River ' (1) ·
'SR-40 WB -Tomoka River ' (1) ·
'SR-714 East of Fla. Tpke.' (1) ·
'US-192 WB-St Johns Relief' (1) ·
'US-1SB - Spruce Cr. S. ' (1)
26232019 (1) ·
26405799 (1) ·
26433147 (1) ·
26433240 (1) ·
26550153 (1) ·
27102072 (1) ·
27102221 (1) ·
27280680 (1) ·
27280700 (1) ·
27281279 (1) ·
27281300 (1) ·
27283525 (1) ·
27283630 (1) ·
27283673 (1) ·
27283927 (1) ·
27283929 (1) ·
27333350 (1) ·
27333415 (1) ·
28053027 (1) ·
28291220 (1) ·
29050202 (1) ·
29050220 (1) ·
29151698 (1) ·
29151780 (1)
80120012 (1) ·
80154828 (1) ·
80161373 (1) ·
80175381 (1) ·
80205810 (1) ·
80205848 (1) ·
80205900 (1) ·
80205926 (1) ·
80235569 (1) ·
80263496 (1) ·
80263571 (1) ·
80265070 (1) ·
80265190 (1) ·
80270210 (1) ·
80270308 (1) ·
80364774 (1) ·
80434234 (1) ·
80434242 (1) ·
80454965 (1) ·
80505570 (1) ·
80580163 (1) ·
81035390 (1) ·
81072482 (1) ·
81072493 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 24 results in range #1 to #24.