Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'CANAL ' (1) ·
'CANAL N. END LAKE IDA ' (1) ·
'CYPRESS CREEK #2 ' (1) ·
'EAST TURTLE CREEK ' (1) ·
'El Rio Canal (E-4) ' (1) ·
'Intracoastal Waterway ' (1) ·
'IWW Indian River ' (1) ·
'LATERAL A CANAL ' (1) ·
'LATERAL A CANAL ' (1) ·
'LATERAL CANAL ' (1) ·
'NORTH RELIEF CANAL ' (1) ·
'RELIEF CANAL ' (1) ·
'RIM DITCH CANAL C-24 ' (1) ·
'Service Rd & Canal ' (1) ·
'St. Lucie River ' (1) ·
'TAYLOR CREEK ' (1) ·
'Taylor Creek(C-25 Canal)' (1) ·
'TEN MILE CREEK ' (1)
'21ST ST SW ' (1) ·
'53RD STREET ' (1) ·
'65TH ST. ' (1) ·
'BEL LIDO DRIVE ' (1) ·
'COUNTY LINE RD ' (1) ·
'CR-510 WABASSO RD ' (1) ·
'CR-619 82ND AVE. ' (1) ·
'CR5A OLD DIXIE HWY' (1) ·
'CR605 OLD DIXIE HW' (1) ·
'CR712A (MCCARTY RD' (1) ·
'EB Spanish Rvr Bvd' (1) ·
'S. LAKE DRIVE ' (1) ·
'SE HARBOR ISLAND ' (1) ·
'SHINN RD (CR-609A)' (1) ·
'SR 707 (Dixie Hwy)' (1) ·
'SR 794 (Yamato Rd)' (1) ·
'SR-401 NB ' (1) ·
'SR-401 SB ' (1) ·
'SR-44 ' (1) ·
'SR-5 (U.S. 1) ' (1) ·
'SR91 N/S TPK 119.1' (1) ·
'SR91 NB TPK 142.2 ' (1) ·
'STAR ISLAND WAY ' (1) ·
'WB Spanish River ' (1)
700030 (1) ·
700117 (1) ·
790172 (1) ·
880018 (1) ·
880044 (1) ·
880047 (1) ·
880049 (1) ·
880062 (1) ·
884036 (1) ·
884047 (1) ·
890003 (1) ·
890079 (1) ·
894017 (1) ·
894018 (1) ·
894021 (1) ·
930015 (1) ·
930154 (1) ·
930226 (1) ·
935303 (1) ·
935900 (1) ·
940009 (1) ·
940027 (1) ·
940029 (1) ·
940030 (1) ·
940082 (1)
'0.2Mi E of GOMEZ AVE. ' (1) ·
'0.3 MILES NORTH OF US-1 ' (1) ·
'0.3Mi E of GOMEZ AVE. ' (1) ·
'0.3MI N OF CR-712 ' (1) ·
'0.7 MILE NORTH OF SR-60 ' (1) ·
'0.9MI N OF CR-630 ' (1) ·
'1.1 MILES NORTH OF SR-70 ' (1) ·
'1.25mi N of SR-68 ' (1) ·
'1.2MI S PORT ST LUCIE RMP' (1) ·
'1.3 MI N OF PLM BCH CO LI' (1) ·
'1/4Mi W of New Roosevelt ' (1) ·
'2.5Mi W of US-1 ' (1) ·
'200FT N of NW 22ND STR ' (1) ·
'200ft. W of A1A ' (1) ·
'25FT. EAST OF 66TH AVE. ' (1) ·
'3.2MI W OF US-1 ' (1) ·
'33FT E OF CR-611 43RD AVE' (1) ·
'3MI W OF CR-615 ' (1) ·
'AT CR-615 (66TH AVE.) ' (1) ·
'E Congress Ave. & W I-95 ' (1) ·
'EB SR800 .2mi West of A1A' (1) ·
'SR-401 NB - Barge Canal ' (1) ·
'SR-401 SB - Barge Canal ' (1) ·
'SR-44 - Indian River ' (1) ·
'WB SR800.2Mi west of US-1' (1)
26231074 (1) ·
26231130 (1) ·
26233940 (1) ·
26235789 (1) ·
26291118 (1) ·
26581931 (1) ·
26590684 (1) ·
27044012 (1) ·
27044356 (1) ·
27121243 (1) ·
27154501 (1) ·
27224710 (1) ·
27234679 (1) ·
27275800 (1) ·
27275808 (1) ·
27335447 (1) ·
27390014 (1) ·
27412374 (1) ·
27413235 (1) ·
27424275 (1) ·
27445538 (1) ·
27445662 (1) ·
28243313 (1) ·
28243318 (1) ·
29021928 (1)
80040020 (1) ·
80041209 (1) ·
80041536 (1) ·
80044372 (1) ·
80055515 (1) ·
80065384 (1) ·
80080433 (1) ·
80080562 (1) ·
80104223 (1) ·
80154065 (1) ·
80194850 (1) ·
80195440 (1) ·
80210806 (1) ·
80245245 (1) ·
80255073 (1) ·
80265381 (1) ·
80274465 (1) ·
80274529 (1) ·
80282176 (1) ·
80291224 (1) ·
80294417 (1) ·
80303713 (1) ·
80375518 (1) ·
80375608 (1) ·
80542264 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour conditions; field review indicates action is required to protect exposed foundations (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1)
Showing below up to 25 results in range #1 to #25.