Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BULLDOG CANAL ' (1) ·
'City St. & Crane Creek ' (1) ·
'Halifax River ' (1) ·
'Indian River ' (1) ·
'Intracoastal Waterway ' (1) ·
'IRRIGATION DITCH #4 ' (1) ·
'IWW Indian River ' (1) ·
'LATERAL A CANAL ' (1) ·
'LATERAL A CANAL ' (1) ·
'LATERAL CANAL ' (1) ·
'LATERAL CANAL D ' (1) ·
'LATERAL CANAL D ' (1) ·
'Nav. Banana River Canal ' (1) ·
'RELIEF CANAL ' (1) ·
'Service Rd & Canal ' (1) ·
'TEN MILE CREEK ' (1) ·
'US-17/92 ' (1)
'21ST ST SW ' (1) ·
'53RD STREET ' (1) ·
'65TH ST. ' (1) ·
'74TH AVE. ' (1) ·
'90TH AVE ' (1) ·
'CARTER RD. ' (1) ·
'CR-619 82ND AVE. ' (1) ·
'CR712A (MCCARTY RD' (1) ·
'EB Spanish Rvr Bvd' (1) ·
'Girard Blvd. ' (1) ·
'NORTH SHORE DRIVE ' (1) ·
'SR-401 SB ' (1) ·
'SR-44 ' (1) ·
'SR-472 ' (1) ·
'SR-510 Wabasso Rd ' (1) ·
'SR-A1A ' (1) ·
'US-1 ' (1) ·
'WB Spanish River ' (1)
700006 (1) ·
700030 (1) ·
704016 (1) ·
790055 (1) ·
790147 (1) ·
790172 (1) ·
880018 (1) ·
880019 (1) ·
880049 (1) ·
880051 (1) ·
884015 (1) ·
884016 (1) ·
884020 (1) ·
884023 (1) ·
884036 (1) ·
884047 (1) ·
930154 (1) ·
930226 (1) ·
937702 (1) ·
940030 (1)
'0.1 mi W of Banana Rvr Dr' (1) ·
'0.2Mi S of 45TH ST(CR702)' (1) ·
'0.3MI N OF CR-712 ' (1) ·
'0.7 MILE NORTH OF SR-60 ' (1) ·
'0.7Mi East of US-1 ' (1) ·
'1MI NORTH OF SR-60 ' (1) ·
'2.4MI S OF SR-60@90TH AVE' (1) ·
'2.6MI N OF SR-60 ' (1) ·
'25FT. EAST OF 66TH AVE. ' (1) ·
'33FT E OF CR-611 43RD AVE' (1) ·
'A1A-Port Orange Relief ' (1) ·
'AT 4TH STREET ' (1) ·
'AT CR-615 (66TH AVE.) ' (1) ·
'EB SR800 .2mi West of A1A' (1) ·
'SR-401 SB - Barge Canal ' (1) ·
'SR-44 - Indian River ' (1) ·
'SR-472 over US-17/92 ' (1) ·
'US-1 - Crane Cr & City St' (1) ·
'WB SR800.2Mi west of US-1' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 20 results in range #1 to #20.