Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Banana River Drive ' (1) ·
'BESSEY CREEK ' (1) ·
'Conners Canal ' (1) ·
'CR-515 & Indian River ' (1) ·
'GARDEN CANAL ' (1) ·
'I-4 EB Ramp B ' (1) ·
'Indian River ' (1) ·
'Indian River Relief ' (1) ·
'Intracoastal Waterway ' (1) ·
'LAT CANAL (LK WORTH INT)' (1) ·
'LOXAHATCHEE WPB CANAL ' (1) ·
'Middle Haw Creek ' (1) ·
'NORTH CANAL ' (1) ·
'OKEECHOBEE RIM CANAL ' (1) ·
'PHIPP CANAL ' (1) ·
'RANGE LINE CANAL ' (1) ·
'RIM DITCH CANAL C-24 ' (1) ·
'S Fork St. Lucie River ' (1) ·
'Sawgrass Creek ' (1) ·
'SR 91 TPK ' (1) ·
'St. Lucie Canal ' (1) ·
'Turkey Creek ' (1)
'CAMINO GARDENS BL ' (1) ·
'CR-508 (69TH ST.) ' (1) ·
'CR-717 ' (1) ·
'CR708 SE BRIDGE RD' (1) ·
'CR712 MDWYRD 150.3' (1) ·
'EB Martin Downs Bd' (1) ·
'I-4 WB ' (1) ·
'INDIAN RIV BLVD NB' (1) ·
'INDIAN RIV BLVD SB' (1) ·
'NB I-95 (SR-9) ' (1) ·
'SB I-95 (SR-9) ' (1) ·
'SR 91 TPK RMP 93.5' (1) ·
'SR-40 ' (1) ·
'SR-44 ' (1) ·
'SR-518 ' (1) ·
'SR-520 EB ' (1) ·
'SR-528 ' (1) ·
'SR-528 WB ' (1) ·
'SR-656 (17th St.) ' (1) ·
'SR91 N/S TPK 103.1' (1) ·
'SR91 N/S TPK 126.5' (1) ·
'SR91 N/S TPK 135.6' (1) ·
'SR91 SB TPK 142.2 ' (1) ·
'US-1 ' (1) ·
'US-192 EB ' (1)
700015 (1) ·
700018 (1) ·
700113 (1) ·
700137 (1) ·
700183 (1) ·
700203 (1) ·
790106 (1) ·
790150 (1) ·
790920 (1) ·
880077 (1) ·
884028 (1) ·
884058 (1) ·
884060 (1) ·
890038 (1) ·
890082 (1) ·
890085 (1) ·
890107 (1) ·
890132 (1) ·
890133 (1) ·
930072 (1) ·
930235 (1) ·
930334 (1) ·
935206 (1) ·
940049 (1) ·
940050 (1)
'0.1MI E of SW 9TH AVE ' (1) ·
'0.4 Mi. W of SR-A1A ' (1) ·
'0.4MI N OF SR-60 ' (1) ·
'0.4MI. N OF SR-60 ' (1) ·
'0.9 M E OF US-1 ON CR-708' (1) ·
'1.0MI NORTH OF SR-708 ' (1) ·
'1.2MI S PORT ST LUCIE BLV' (1) ·
'1.3 MI N OF STUART INTRCH' (1) ·
'1.9 MI WEST OF SR-715 ' (1) ·
'1MI W OF CR-615 ' (1) ·
'1mi N of SR-76(Kanner Hw)' (1) ·
'2.55 Miles East of SR-3 ' (1) ·
'2.6 MI S OF FT PIER INTCH' (1) ·
'3.0 MI NORTH OF SR-704 ' (1) ·
'I-4 WB over I-4 EB Ramp B' (1) ·
'LAKE WORTH INTERCHANGE ' (1) ·
'SR 520 EB - Indian River ' (1) ·
'SR-40 over Middle Haw Cr.' (1) ·
'SR-44 - Conners Canal ' (1) ·
'SR-518 - Indian River Rel' (1) ·
'SR-528 WB - CR-515 ' (1) ·
'SR-714 East of Fla. Tpke.' (1) ·
'US-1 over Turkey Creek ' (1) ·
'US-192EB - Sawgrass Creek' (1)
26201913 (1) ·
26371314 (1) ·
26421986 (1) ·
26450626 (1) ·
27033219 (1) ·
27035280 (1) ·
27070958 (1) ·
27071400 (1) ·
27102221 (1) ·
27102733 (1) ·
27154481 (1) ·
27222822 (1) ·
27375640 (1) ·
27392294 (1) ·
27392357 (1) ·
27431016 (1) ·
28015978 (1) ·
28053192 (1) ·
28081497 (1) ·
28212281 (1) ·
28240489 (1) ·
28241813 (1) ·
29015737 (1) ·
29091631 (1) ·
29143956 (1)
80060914 (1) ·
80072029 (1) ·
80080366 (1) ·
80101893 (1) ·
80142789 (1) ·
80154828 (1) ·
80160809 (1) ·
80161732 (1) ·
80184796 (1) ·
80210855 (1) ·
80221680 (1) ·
80230229 (1) ·
80230306 (1) ·
80230357 (1) ·
80284193 (1) ·
80344732 (1) ·
80360766 (1) ·
80394909 (1) ·
80424695 (1) ·
80430520 (1) ·
80444580 (1) ·
80494830 (1) ·
80545970 (1) ·
81044346 (1) ·
81133337 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 25 results in range #1 to #25.