Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BRANCH OF C-44 CANAL ' (1) ·
'C-23 CANAL ' (1) ·
'C-51 CANAL ' (1) ·
'CSX RAILROAD ' (1) ·
'E-1 CANAL ' (1) ·
'E-1-E CANAL ' (1) ·
'FEC RR & Georgia Ave. ' (1) ·
'Intracoastal Waterway ' (1) ·
'LK OSBORNE DR& CENTER DR' (1) ·
'LK OSBORNE DR&CENTER DR ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'MAIN CANAL ' (1) ·
'MIAMI CANAL ' (1) ·
'N RELIEF CANAL ' (1) ·
'PARK LATERAL CANAL ' (1)
'101ST STREET ' (1) ·
'6TH AVE SO. EB ' (1) ·
'6TH AVE SO. WB ' (1) ·
'CORKSCREW BLVD. ' (1) ·
'COUNTRY CLUB DRIVE' (1) ·
'CR 613 (58TH AVE) ' (1) ·
'CR-880 ' (1) ·
'CR726(CITRUS BLVD)' (1) ·
'EB SR706 ' (1) ·
'LE CHALET BLVD ' (1) ·
'MARINA BLVD. ' (1) ·
'MURPHY RD ' (1) ·
'PLM BEACH LAKES BL' (1) ·
'US-98 (SR-80) ' (1) ·
'WB SR 706 ' (1)
884053 (1) ·
884055 (1) ·
884063 (1) ·
890015 (1) ·
894003 (1) ·
930053 (1) ·
930453 (1) ·
930454 (1) ·
930940 (1) ·
934302 (1) ·
934307 (1) ·
934487 (1) ·
934502 (1) ·
934943 (1) ·
934944 (1) ·
937709 (1)
'.25m W of US-1 on US-98 ' (1) ·
'0.1MI W OF DIXIE HIGHWAY ' (1) ·
'0.1MI W of US-98 / SR-441' (1) ·
'0.2MI E OF SR-7 (US-441) ' (1) ·
'0.2MI S OF US-27 ' (1) ·
'0.3MI W OF CR-507 ' (1) ·
'0.4MI N OF 49TH ST. ' (1) ·
'0.6MI W OF I-95 ' (1) ·
'0.6MI WEST OF I-95 ' (1) ·
'0.8Mi W OF MILITARY TRAIL' (1) ·
'1.1MI NW OF HIGH MEADOW ' (1) ·
'3.6 Mi. E of SR-710 ' (1) ·
'50FT E OF SR-7 (US-441) ' (1) ·
'50FT. S OF 30TH STREET ' (1) ·
'Indiantown Rd./ICW ' (1) ·
'Indiantown Rd/ ICW ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 16 results in range #1 to #16.