Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'CSX Railroad ' (1) ·
'I 95 SR 9 ' (1) ·
'I-95 ' (1) ·
'I-95 (SR-9) ' (1) ·
'INTRACOASTAL WATERWAY ' (1) ·
'L-5 Canal ' (1) ·
'LAKE MANGONIA CANAL ' (1) ·
'Lantana Road ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'NORTH NEW RIVER CANAL ' (1) ·
'PGA Blvd SR 786 ' (1) ·
'S. Fork St. Lucie River ' (1) ·
'SR 70 ' (1) ·
'SR 802 Lake Worth Rd ' (1) ·
'SR802 Lake Worth Rd ' (1) ·
'WARNER CREEK ' (1) ·
Indian River ICW (1)
'10TH AVE NORTH ' (1) ·
'DIXIE HIGHWAY ' (1) ·
'DONALD ROSS RD EB ' (1) ·
'DONALD ROSS RD WB ' (1) ·
'I 95 SR 9 NB ' (1) ·
'I 95 SR 9 SB ' (1) ·
'NB US-27 SR-25 ' (1) ·
'PALM B LAKE BVD WB' (1) ·
'SB I 95 SR 9 ' (1) ·
'SB I 95 to Lantana' (1) ·
'SB US-27 SR-25 ' (1) ·
'SR 91 TPK SB 153.2' (1) ·
'SR-407 ' (1) ·
'SR-528 EB ' (1) ·
'SR-528 WB ' (1) ·
'SR-76 ' (1) ·
'SR-80 ' (1) ·
'SW 23 Ave Golf Rd ' (1) ·
SR-518 (1)
700091 (1) ·
700184 (1) ·
700197 (1) ·
700198 (1) ·
890113 (1) ·
890127 (1) ·
930029 (1) ·
930261 (1) ·
930262 (1) ·
930275 (1) ·
930303 (1) ·
930304 (1) ·
930335 (1) ·
930352 (1) ·
930353 (1) ·
934160 (1) ·
934161 (1) ·
934224 (1) ·
934348 (1) ·
940134 (1)
'.25 mi East of I-95 ' (1) ·
'.2mi East of US-27 ' (1) ·
'0.6Mi W OF AUSTRALIAN AVE' (1) ·
'0.8MI WEST OF US-1 ' (1) ·
'0.9MI W OF MILITARY TRAIL' (1) ·
'1.2Mi. E of Savannah Rd. ' (1) ·
'1mi. N of North Lake Blvd' (1) ·
'2 mi. N of Lantana Rd ' (1) ·
'2 mi. North of Lantana Rd' (1) ·
'2.6 MILES NORTH OF SR-709' (1) ·
'4.2MI NORTH OF SR-528 ' (1) ·
'Just West of I 95 ' (1) ·
'Lantana I 95 Interchange ' (1) ·
'Over I 95 1 mi S of SR804' (1) ·
'Palm Beach - Broward Line' (1) ·
'SR-528 EB at I-95 ' (1) ·
'SR-528 WB at I-95 ' (1) ·
SR-518 over Indian River (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 20 results in range #1 to #20.