Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'CR-707(Citrus Ave)' (1) ·
'DIXIE HIGHWAY ' (1) ·
'DONALD ROSS RD EB ' (1) ·
'DONALD ROSS RD WB ' (1) ·
'I-95 NB ' (1) ·
'I-95 SB ' (1) ·
'NB US-27 SR-25 ' (1) ·
'PALM B LAKE BVD WB' (1) ·
'Saxon Blvd EB ' (1) ·
'Saxon Blvd WB ' (1) ·
'SB I 95 to Lantana' (1) ·
'SB US-27 SR-25 ' (1) ·
'SR 91 TPK SB 153.2' (1) ·
'SR-407 ' (1) ·
'SR-528 EB ' (1) ·
'SR-528 WB ' (1) ·
'SW 23 Ave Golf Rd ' (1)
700052 (1) ·
700091 (1) ·
700127 (1) ·
700197 (1) ·
700198 (1) ·
790082 (1) ·
790166 (1) ·
790167 (1) ·
890113 (1) ·
930275 (1) ·
930303 (1) ·
930304 (1) ·
930352 (1) ·
930353 (1) ·
934160 (1) ·
934161 (1) ·
934224 (1) ·
940047 (1) ·
940134 (1)
'0.6Mi W OF AUSTRALIAN AVE' (1) ·
'0.8MI WEST OF US-1 ' (1) ·
'1.2Mi. E of Savannah Rd. ' (1) ·
'2.6 MILES NORTH OF SR-709' (1) ·
'4.2MI NORTH OF SR-528 ' (1) ·
'Citrus Ave/FEC RR ' (1) ·
'I-95 NB - SR-520 ' (1) ·
'I-95 SB - SR-520 ' (1) ·
'I-95 SB over US-1 ' (1) ·
'Just West of I 95 ' (1) ·
'Lantana I 95 Interchange ' (1) ·
'Over I 95 1 mi S of SR804' (1) ·
'Palm Beach - Broward Line' (1) ·
'Saxon Blvd EB - I-4 ' (1) ·
'Saxon Blvd WB - I-4 ' (1) ·
'SR-528 EB at I-95 ' (1) ·
'SR-528 WB at I-95 ' (1)
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 19 results in range #1 to #19.