Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-18 Canal ' (1) ·
'C-51/WEST PALM BCH CANAL' (1) ·
'Donald Ross Road ' (1) ·
'FLORIDA TURNPIKE ' (1) ·
'Halifax River ' (1) ·
'Intracoastal Waterway ' (1) ·
'LAKE MANGONIA CANAL ' (1) ·
'Long Creek ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'LWDD E-4 CANAL ' (1) ·
'LWDD LAT CANAL 17 ' (1) ·
'MAIN RELIEF CANAL ' (1) ·
'MOORES CREEK ' (1) ·
'N. Fork St. Lucie River ' (1) ·
'SR-404 ' (1) ·
'SR-91 (FL TURNPIKE) ' (1)
'Atlantic Avenue ' (1) ·
'BINKS FOREST DRIVE' (1) ·
'CONGRESS AVE NB ' (1) ·
'CR-611 43RD AVE. ' (1) ·
'EB Prt St Lucie Bd' (1) ·
'EB St. Lucie Blvd.' (1) ·
'NB I 95 SR 9 ' (1) ·
'NB I-95 ( SR-9 ) ' (1) ·
'NORTH 2ND STREET ' (1) ·
'NORTHLAKE BLVD(EB)' (1) ·
'NORTHLAKE BLVD(WB)' (1) ·
'Orange Avenue ' (1) ·
'PALM B LAKE BVD EB' (1) ·
'S. VERDE TRAIL ' (1) ·
'SB I 95 SR 9 ' (1) ·
'SB I-95 ( SR-9 ) ' (1) ·
'ST LUCIE W BLVD WB' (1) ·
'SW 15TH AVE ' (1) ·
'US-1 SB ' (1) ·
'WB St. Lucie Blvd.' (1)
700075 (1) ·
794120 (1) ·
884056 (1) ·
930064 (1) ·
930382 (1) ·
930383 (1) ·
930386 (1) ·
930387 (1) ·
934148 (1) ·
934149 (1) ·
934293 (1) ·
934332 (1) ·
934461 (1) ·
934903 (1) ·
937706 (1) ·
940139 (1) ·
940140 (1) ·
940144 (1) ·
945000 (1) ·
949901 (1)
'0.1MI W OF BAYSHORE BLVD.' (1) ·
'0.2 MI N OF ORANGE AVE. ' (1) ·
'0.25 Mi E of US-1 SR-5 ' (1) ·
'0.2MI W OF I-95 ' (1) ·
'0.3 mile South of SR 706 ' (1) ·
'0.6Mi S OF CR-812 ' (1) ·
'0.6Mi W OF AUSTRALIAN AVE' (1) ·
'1.5MI W OF MILITARY TRAIL' (1) ·
'1.8mi. East of SR-91 ' (1) ·
'250ft North of SR-60 ' (1) ·
'2mi. East of SR-91 ' (1) ·
'At S Military Trail ' (1) ·
'AT US-441 (SOUTHERN BLVD)' (1) ·
'Between SR-A1A & SR-5 ' (1) ·
'I-95 / Donald Ross Rd ' (1) ·
'South of Ramp to SR 706 ' (1) ·
'US-1 SB - SR-404 ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 20 results in range #1 to #20.