Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'6th Avenue South ' (1) ·
'C-18 Canal ' (1) ·
'C-51/WEST PALM BCH CANAL' (1) ·
'CR 702 45th Street ' (1) ·
'Donald Ross Road ' (1) ·
'Eau Gallie River ' (1) ·
'Halifax River ' (1) ·
'Intracoastal Waterway ' (1) ·
'LWDD E-4 CANAL ' (1) ·
'MAIN RELIEF CANAL ' (1) ·
'Northlake Blvd. ' (1) ·
'SR 708 (Blue Heron Blvd)' (1) ·
'SR 882 Forest Hill Blvd ' (1) ·
'W.P.B. Canal (C-51) ' (1) ·
'WEST PALM BEACH CANAL ' (1) ·
'WPB CANAL C-51 ' (1) ·
'WPB Drainage Canal ' (1)
'Apollo Boulevard ' (1) ·
'BINKS FOREST DRIVE' (1) ·
'CENTRE PARK BLVD. ' (1) ·
'CR-611 43RD AVE. ' (1) ·
'I 95 SR 9 ' (1) ·
'I-95 (SR 9) ' (1) ·
'KIRK ROAD ' (1) ·
'NB I 95 SR 9 ' (1) ·
'NB I-95 ( SR-9 ) ' (1) ·
'Orange Avenue ' (1) ·
'SB I 95 SR 9 ' (1) ·
'SB I-95 ( SR-9 ) ' (1) ·
'SR-656 (17th St.) ' (1) ·
'SR-805 (Dixie Hwy)' (1) ·
'SW 15TH AVE ' (1)
705604 (1) ·
794120 (1) ·
880077 (1) ·
884056 (1) ·
930294 (1) ·
930373 (1) ·
930382 (1) ·
930383 (1) ·
930386 (1) ·
930387 (1) ·
930458 (1) ·
930516 (1) ·
930519 (1) ·
930520 (1) ·
930540 (1) ·
934293 (1) ·
934461 (1) ·
934751 (1) ·
937715 (1)
'.75 miles South of SR-882' (1) ·
'0.2 Mi East of Australian' (1) ·
'0.25 Mi E of US-1 SR-5 ' (1) ·
'0.2MI W OF I-95 ' (1) ·
'0.3 mile South of SR 706 ' (1) ·
'0.4 Mi. W of SR-A1A ' (1) ·
'1 mi N Palm Bch Lake Blvd' (1) ·
'1.3mi South of 10th Ave N' (1) ·
'250ft North of SR-60 ' (1) ·
'Apollo Blvd - Eau Gallie ' (1) ·
'At Exit 74 ' (1) ·
'At Exit 76 ' (1) ·
'AT SR-80 SOUTHERN BLVD ' (1) ·
'AT US-441 (SOUTHERN BLVD)' (1) ·
'Between SR 710 and 786 ' (1) ·
'I-95 / Donald Ross Rd ' (1) ·
'I-95 / SR 882 ' (1) ·
'South of Ramp to SR 706 ' (1)
10585 (1) ·
1550 (1) ·
160500 (1) ·
19400 (1) ·
19575 (1) ·
213000 (1) ·
2160 (1) ·
226000 (1) ·
23000 (1) ·
232000 (1) ·
25500 (1) ·
44000 (1) ·
52652 (1) ·
71250 (1) ·
9900 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
123619 (1) ·
17176 (1) ·
18365 (1) ·
2000 (1) ·
23686 (1) ·
27000 (1) ·
27500 (1) ·
278468 (1) ·
33659 (1) ·
369555 (1) ·
392110 (1) ·
39905 (1) ·
402520 (1) ·
76340 (1) ·
91351 (1)
Showing below up to 19 results in range #1 to #19.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)