Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'11th St. Canal ' (1) ·
'14TH STREET CANAL ' (1) ·
'C-18 Canal ' (1) ·
'C-3 Canal ' (1) ·
'Canal 29 (5 mile creek) ' (1) ·
'CYPRESS CREEK #2 ' (1) ·
'E-1 Canal ' (1) ·
'HUNGRYLAND CANAL C-18 ' (1) ·
'Lateral C Canal ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'LWDD E-4 Canal ' (1) ·
'M CANAL ' (1) ·
'M-1 CANAL ' (1) ·
'NORTH NEW RIVER CANAL ' (1) ·
'S. Fork St. Lucie River ' (1) ·
'TEN MILE CREEK ' (1) ·
Indian River ICW (1)
'10TH AVE NORTH ' (1) ·
'CR-603-IND RIV BLV' (1) ·
'CRESTWOOD BLVD. N ' (1) ·
'HAVERHILL ROAD ' (1) ·
'Island Way ' (1) ·
'Lake Ida Road ' (1) ·
'Oslo Rd (CR-606) ' (1) ·
'Quantum Blvd. ' (1) ·
'SR 68 (Orange Ave)' (1) ·
'SR-76 ' (1) ·
'SR-80 ' (1) ·
'SR91 N/S TPK 115.5' (1) ·
'SR91 N/S TPK 119.1' (1) ·
'SR91 N/S TPK 152.5' (1) ·
'Stribling Way ' (1) ·
'US-1 ' (1) ·
'W. CAMINO REAL ' (1) ·
SR-518 (1)
700184 (1) ·
790013 (1) ·
884054 (1) ·
884076 (1) ·
890079 (1) ·
890127 (1) ·
930029 (1) ·
930239 (1) ·
934177 (1) ·
934256 (1) ·
934301 (1) ·
934348 (1) ·
934406 (1) ·
934963 (1) ·
936375 (1) ·
937367 (1) ·
940072 (1) ·
940152 (1)
'.25 mi East of I-95 ' (1) ·
'.2mi East of US-27 ' (1) ·
'0.14MI N of Indiantown Rd' (1) ·
'0.19Mi. E of Congress Ave' (1) ·
'0.3MI W OF ROYAL PALM BL ' (1) ·
'0.5 MI SOUTH OF SR-70 ' (1) ·
'0.7Mi S OF CR-702/45TH ST' (1) ·
'0.9MI W OF MILITARY TRAIL' (1) ·
'1 mi. east I-95 on SR 68 ' (1) ·
'1.0MI SOUTH OF SR-706 ' (1) ·
'1.3 MI N OF PLM BCH CO LI' (1) ·
'1.4MI NORTH OF US-1 ' (1) ·
'1Mi E of CR809/Military T' (1) ·
'At CR-611 - 43rd Ave ' (1) ·
'AT SR-809 / WCAMINOREA ' (1) ·
'StriblingWay ovr E-1canal' (1) ·
'US-1 over 11th Canal ' (1) ·
SR-518 over Indian River (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1)
Showing below up to 18 results in range #1 to #18.