Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-17 Canal ' (1) ·
'C-18 Canal ' (1) ·
'C-51/WEST PALM BCH CANAL' (1) ·
'E-1 CANAL ' (1) ·
'Eau Gallie River ' (1) ·
'El Rio Canal E-4 ' (1) ·
'Halifax River ' (1) ·
'Intracoastal Waterway ' (1) ·
'Lake Ida / Canal E-4 ' (1) ·
'Lateral B Canal ' (1) ·
'LWDD E-4 CANAL ' (1) ·
'MAIN RELIEF CANAL ' (1) ·
'Thompson River ' (1) ·
'W.P.B. Canal (C-51) ' (1) ·
'WEST PALM BEACH CANAL ' (1) ·
'WPB CANAL C-51 ' (1) ·
Sebastian River (1)
'Apollo Boulevard ' (1) ·
'BINKS FOREST DRIVE' (1) ·
'Boynton Bch Blvd ' (1) ·
'CENTRE PARK BLVD. ' (1) ·
'CR-606 Oslo Rd ' (1) ·
'CR-611 43RD AVE. ' (1) ·
'KIRK ROAD ' (1) ·
'LANTANA RD.CR-812 ' (1) ·
'Military Trail ' (1) ·
'NB I 95 SR 9 ' (1) ·
'Orange Avenue ' (1) ·
'SB I 95 SR 9 ' (1) ·
'SR 710 ' (1) ·
'SR-656 (17th St.) ' (1) ·
'SR-805 (Dixie Hwy)' (1) ·
'SR806 Atlantic Ave' (1) ·
'SW 15TH AVE ' (1) ·
US-1 (1)
700224 (1) ·
705604 (1) ·
794120 (1) ·
880077 (1) ·
884056 (1) ·
884071 (1) ·
930069 (1) ·
930237 (1) ·
930373 (1) ·
930386 (1) ·
930387 (1) ·
930534 (1) ·
934138 (1) ·
934293 (1) ·
934360 (1) ·
934461 (1) ·
934751 (1) ·
937715 (1)
'.75 miles South of SR-882' (1) ·
'0.2 Mi East of Australian' (1) ·
'0.25 Mi E of US-1 SR-5 ' (1) ·
'0.25mi. east of I-95 ' (1) ·
'0.2MI W OF I-95 ' (1) ·
'0.3 mile South of SR 706 ' (1) ·
'0.4 Mi. W of SR-A1A ' (1) ·
'0.7 mi south of PGA Blvd.' (1) ·
'0.7 mi. W of I-95 ' (1) ·
'250ft North of SR-60 ' (1) ·
'ADJACENT TO US-441 ' (1) ·
'Apollo Blvd - Eau Gallie ' (1) ·
'At CR-613 ' (1) ·
'AT SR-80 SOUTHERN BLVD ' (1) ·
'AT US-441 (SOUTHERN BLVD)' (1) ·
'Just W. of Congress Ave.' (1) ·
'South of Ramp to SR 706 ' (1) ·
US-1 over Sebastian River (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1)
Showing below up to 18 results in range #1 to #18.