Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'14TH STREET CANAL ' (1) ·
'C-18 Canal ' (1) ·
'C-3 Canal ' (1) ·
'C-51/WEST PALM BCH CANAL' (1) ·
'CYPRESS CREEK #2 ' (1) ·
'E-1 Canal ' (1) ·
'Eau Gallie River ' (1) ·
'Halifax River ' (1) ·
'HUNGRYLAND CANAL C-18 ' (1) ·
'Intracoastal Waterway ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'LWDD E-4 CANAL ' (1) ·
'M-1 CANAL ' (1) ·
'MAIN RELIEF CANAL ' (1) ·
'NORTH NEW RIVER CANAL ' (1) ·
'S. Fork St. Lucie River ' (1) ·
'W.P.B. Canal (C-51) ' (1) ·
'WEST PALM BEACH CANAL ' (1) ·
'WPB CANAL C-51 ' (1) ·
Indian River ICW (1)
'10TH AVE NORTH ' (1) ·
'Apollo Boulevard ' (1) ·
'BINKS FOREST DRIVE' (1) ·
'CENTRE PARK BLVD. ' (1) ·
'CR-603-IND RIV BLV' (1) ·
'CR-611 43RD AVE. ' (1) ·
'CRESTWOOD BLVD. N ' (1) ·
'Island Way ' (1) ·
'KIRK ROAD ' (1) ·
'Lake Ida Road ' (1) ·
'NB I 95 SR 9 ' (1) ·
'Orange Avenue ' (1) ·
'SB I 95 SR 9 ' (1) ·
'SR-656 (17th St.) ' (1) ·
'SR-76 ' (1) ·
'SR-80 ' (1) ·
'SR-805 (Dixie Hwy)' (1) ·
'SR91 N/S TPK 115.5' (1) ·
'SR91 N/S TPK 119.1' (1) ·
'Stribling Way ' (1) ·
'SW 15TH AVE ' (1) ·
SR-518 (1)
700184 (1) ·
705604 (1) ·
794120 (1) ·
880077 (1) ·
884054 (1) ·
884056 (1) ·
890079 (1) ·
890127 (1) ·
930029 (1) ·
930239 (1) ·
930373 (1) ·
930386 (1) ·
930387 (1) ·
934177 (1) ·
934293 (1) ·
934301 (1) ·
934348 (1) ·
934461 (1) ·
934751 (1) ·
934963 (1) ·
937367 (1) ·
937715 (1)
'.25 mi East of I-95 ' (1) ·
'.2mi East of US-27 ' (1) ·
'.75 miles South of SR-882' (1) ·
'0.14MI N of Indiantown Rd' (1) ·
'0.2 Mi East of Australian' (1) ·
'0.25 Mi E of US-1 SR-5 ' (1) ·
'0.2MI W OF I-95 ' (1) ·
'0.3 mile South of SR 706 ' (1) ·
'0.3MI W OF ROYAL PALM BL ' (1) ·
'0.4 Mi. W of SR-A1A ' (1) ·
'0.9MI W OF MILITARY TRAIL' (1) ·
'1.0MI SOUTH OF SR-706 ' (1) ·
'1.3 MI N OF PLM BCH CO LI' (1) ·
'1.4MI NORTH OF US-1 ' (1) ·
'1Mi E of CR809/Military T' (1) ·
'250ft North of SR-60 ' (1) ·
'Apollo Blvd - Eau Gallie ' (1) ·
'AT SR-80 SOUTHERN BLVD ' (1) ·
'AT US-441 (SOUTHERN BLVD)' (1) ·
'South of Ramp to SR 706 ' (1) ·
'StriblingWay ovr E-1canal' (1) ·
SR-518 over Indian River (1)
26282306 (1) ·
26305150 (1) ·
26375277 (1) ·
26380939 (1) ·
26383999 (1) ·
26395130 (1) ·
26403700 (1) ·
26405713 (1) ·
26413718 (1) ·
26434195 (1) ·
26554196 (1) ·
26554700 (1) ·
26554800 (1) ·
26561000 (1) ·
26581931 (1) ·
27064891 (1) ·
27373700 (1) ·
27375640 (1) ·
27382201 (1) ·
28073710 (1) ·
28075792 (1) ·
29123122 (1)
80032221 (1) ·
80041853 (1) ·
80044272 (1) ·
80061380 (1) ·
80062196 (1) ·
80074621 (1) ·
80082400 (1) ·
80085515 (1) ·
80085650 (1) ·
80090356 (1) ·
80104223 (1) ·
80121322 (1) ·
80135529 (1) ·
80152053 (1) ·
80172828 (1) ·
80221680 (1) ·
80224294 (1) ·
80254872 (1) ·
80370269 (1) ·
80384610 (1) ·
80424470 (1) ·
81010006 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1)
Showing below up to 22 results in range #1 to #22.