Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BOYNTON CANAL C-16 ' (1) ·
'C-15 CANAL ' (1) ·
'C-51 CANAL ' (1) ·
'CANAL E-4 ' (1) ·
'E3 CANAL ' (1) ·
'E3-canal ' (1) ·
'EL RIO CANAL ' (1) ·
'Hillsboro Canal L14 ' (1) ·
'Lateral A Canal ' (1) ·
'LWDD C-16 CANAL ' (1) ·
'LWDD E 3-1/2 CANAL ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'M CANAL ' (1) ·
'Main Relief Canal ' (1) ·
'RCA CANAL ' (1) ·
'SR-507 ' (1) ·
Indian River Relief East (1)
'27th Street ' (1) ·
'57th Street ' (1) ·
'BIG BLUE TRACE ' (1) ·
'Boynton Bch Blvd. ' (1) ·
'CAMINO REAL ' (1) ·
'CONGRESS AVE ' (1) ·
'LAKE IDA ROAD ' (1) ·
'Melaleuca Lane ' (1) ·
'NW 13 ST ' (1) ·
'PROS. FARMS ROAD ' (1) ·
'SEACREST BLVD. ' (1) ·
'SR-15 Main St. ' (1) ·
'SR-507 ' (1) ·
'SUMMIT BLVD ' (1) ·
SR-520 (1)
700186 (1) ·
700196 (1) ·
884077 (1) ·
884093 (1) ·
930338 (1) ·
930438 (1) ·
934139 (1) ·
934212 (1) ·
934228 (1) ·
934258 (1) ·
934361 (1) ·
934470 (1) ·
934491 (1) ·
934499 (1) ·
934960 (1) ·
934964 (1) ·
934965 (1) ·
935215 (1)
'0.03Mi E of NW 15TH AVE ' (1) ·
'0.3MI E OF CONGRESS ' (1) ·
'0.4 MI W of US-1 ' (1) ·
'0.4MI S OF LINTON BLVD ' (1) ·
'0.4MI W OF HAVERHILL BLVD' (1) ·
'0.5 MILES WEST OF SR-809 ' (1) ·
'0.6Mi NORTH OF SR-804 ' (1) ·
'0.7MI S OF 45TH STREET ' (1) ·
'0.8Mi NORTH OF CR-804 ' (1) ·
'1.1 MI E OF JOG ROAD ' (1) ·
'1.1Mi W of Miltiary Trail' (1) ·
'130ft. S of Aviation Blvd' (1) ·
'At CR-615 (66th Ave.) ' (1) ·
'At East Canal St. ' (1) ·
'AT SOUTHSIDE OF SR-80 ' (1) ·
'S SIDE OF RCA/MONET ROAD ' (1) ·
'SR-507 over Crane Creek ' (1) ·
SR-520 - Indian River Relief (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1)
Showing below up to 18 results in range #1 to #18.