Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-15 Canal ' (1) ·
'C-17 CANAL ' (1) ·
'C-51 Canal ' (1) ·
'E-1 Canal ' (1) ·
'E-2-E Canal ' (1) ·
'E-2W Canal ' (1) ·
'FORK OF ST. LUCIE RIVER ' (1) ·
'KRUEGER CREEK ' (1) ·
'Lateral A Canal ' (1) ·
'LWDD E-1 Canal ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'LWDD L30 Canal ' (1) ·
'Palm Beach Canal C-51 ' (1) ·
'South Relief Canal ' (1) ·
'ST. LUCIE RIVER ' (1)
'16th St/College Ln' (1) ·
'Benoist Farms Rd ' (1) ·
'CR-A1A(OCEAN BLVD)' (1) ·
'CR605 Old Dixie ' (1) ·
'FOREST HILL BLVD. ' (1) ·
'Hagen Ranch Road ' (1) ·
'Lake Worth Road ' (1) ·
'LYONS ROAD ' (1) ·
'PALMETTO PK RD ' (1) ·
'PRIMA VISTA BLVD. ' (1) ·
'PROSPERITY FARMS R' (1) ·
'SB I 95 SR 9 ' (1) ·
'SR-5/S. Olive Ave.' (1) ·
'SR-808 (Glades Rd)' (1) ·
'W/B Atlantic Ave ' (1)
884084 (1) ·
884086 (1) ·
890120 (1) ·
930184 (1) ·
930367 (1) ·
930401 (1) ·
930413 (1) ·
930440 (1) ·
930456 (1) ·
934116 (1) ·
934213 (1) ·
934711 (1) ·
934731 (1) ·
934902 (1) ·
934958 (1) ·
944011 (1) ·
944012 (1)
'.5mi East US1 Lakeworth ' (1) ·
'0.3MI N OF N. LAKE BLVD. ' (1) ·
'0.8 MI W OF US-1 ' (1) ·
'0.9 MI W OF US-1 ' (1) ·
'1 mile S of Linton Blvd ' (1) ·
'1.3 Mi. North of CR-606 ' (1) ·
'2.0 Miles N of SR-806 ' (1) ·
'2MI E of SR-76 ' (1) ·
'ADJ W SIDE MILITARY TRAIL' (1) ·
'AT SOUTHERN/FORESTHILINTR' (1) ·
'Atlantic Ave./Fl. Tpk. ' (1) ·
'Benoist Farms Rd at SR-80' (1) ·
'Inter 66th Ave/College Ln' (1) ·
'Lake Worth Rd at FL Trnpk' (1) ·
'Lake Worth Rd. at SR-7 ' (1) ·
'LYONS ROAD SOUTH OF SR-80' (1) ·
'SR-808 at SR-7 Boca Raton' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Showing below up to 17 results in range #1 to #17.