Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Banana River ' (1) ·
'C-17 Canal ' (1) ·
'Canal C-51 ' (1) ·
'Conners Canal ' (1) ·
'E-1 CANAL ' (1) ·
'El Rio Canal E-4 ' (1) ·
'Lake Ida / Canal E-4 ' (1) ·
'Lateral B Canal ' (1) ·
'Lateral C Canal ' (1) ·
'MAIN CANAL VERO BEACH ' (1) ·
'Range Line Canal ' (1) ·
'Taylor Creek(C-25 Canal)' (1) ·
'Thompson River ' (1) ·
'West Palm Beach Canal ' (1) ·
Sebastian River (1)
'13th Street SW ' (1) ·
'16th Street ' (1) ·
'5th Street SW ' (1) ·
'Boynton Bch Blvd ' (1) ·
'CONGRESS AVE ' (1) ·
'CR-606 Oslo Rd ' (1) ·
'LANTANA RD.CR-812 ' (1) ·
'LittleRanchesTrail' (1) ·
'Military Trail ' (1) ·
'SB US-441 (SR-7) ' (1) ·
'SR 710 ' (1) ·
'SR-44 ' (1) ·
'SR-5 (U.S. 1) ' (1) ·
'SR-520 EB ' (1) ·
'SR806 Atlantic Ave' (1) ·
'US-1 (SR-5) ' (1) ·
US-1 (1)
700220 (1) ·
700224 (1) ·
790150 (1) ·
880085 (1) ·
884071 (1) ·
884081 (1) ·
884085 (1) ·
884105 (1) ·
930069 (1) ·
930237 (1) ·
930410 (1) ·
930534 (1) ·
934138 (1) ·
934259 (1) ·
934360 (1) ·
935920 (1) ·
940009 (1)
'0.2 MI SOUTH OF 45TH ST ' (1) ·
'0.25mi. east of I-95 ' (1) ·
'0.7 mi south of PGA Blvd.' (1) ·
'0.7 mi. W of I-95 ' (1) ·
'0.75 Mile North of SR-60 ' (1) ·
'1.25mi N of SR-68 ' (1) ·
'5th St. SW at CR-611 ' (1) ·
'ADJACENT TO US-441 ' (1) ·
'At 74th Avenue ' (1) ·
'At CR-613 ' (1) ·
'At CR-613 (58th Ave.) ' (1) ·
'Just W. of Congress Ave.' (1) ·
'South Side of US-98 ' (1) ·
'SR-44 - Conners Canal ' (1) ·
'SR-520 EB - Banana River ' (1) ·
'SR-7 & SR-80 intersection' (1) ·
US-1 over Sebastian River (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1)
Showing below up to 17 results in range #1 to #17.