Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BOYNTON CANAL ' (1) ·
'C-54 Canal ' (1) ·
'E-4 Canal ' (1) ·
'Indian River / ICW ' (1) ·
'L-5 CANAL ' (1) ·
'LATERAL U CANAL ' (1) ·
'Little Lake Worth ' (1) ·
'LWDD E- 2W CANAL ' (1) ·
'LWDD E-2E Canal ' (1) ·
'LWDD LAT. 38 CANAL ' (1) ·
'PARK LATERAL CANAL ' (1) ·
'Spruce Creek ' (1) ·
'ST LUCIE CANAL ' (1) ·
'St. Johns River ' (1) ·
'Ten Mile Creek ' (1) ·
'Tomoka River ' (1)
'CLINT MOORE RD WB ' (1) ·
'CLINT MOORE RD. WB' (1) ·
'CR-512 ' (1) ·
'I-4 EB ' (1) ·
'I-4 WB ' (1) ·
'I-95 NB ' (1) ·
'JOG ROAD (NB) ' (1) ·
'JOG ROAD (SB) ' (1) ·
'LYONS ROAD ' (1) ·
'Old Boynton Road ' (1) ·
'SB I-95 (SR-9) ' (1) ·
'SR A1A ' (1) ·
'SR-415 ' (1) ·
'SR-732 -Jensen Bch' (1) ·
'SR-91 TPK NB 131.0' (1)
700238 (1) ·
790201 (1) ·
790202 (1) ·
790219 (1) ·
790227 (1) ·
884067 (1) ·
884068 (1) ·
890145 (1) ·
891000 (1) ·
930546 (1) ·
934271 (1) ·
934272 (1) ·
934913 (1) ·
934956 (1) ·
934966 (1) ·
934968 (1) ·
934981 (1) ·
940122 (1)
'.5 miles South of SR-70 ' (1) ·
'.5mi E. of Indian R Dr. ' (1) ·
'0.3 mi east of US 1 & PGA' (1) ·
'0.4Mi. East of Congress A' (1) ·
'0.6MI S of SOUTHERN BLVD ' (1) ·
'0.7MI N OF BOYNTON BH BL ' (1) ·
'1.9 Mi E of US-441 ' (1) ·
'1.9 Miles East of US-441 ' (1) ·
'1MI N OF CLINT MOORE RD ' (1) ·
'3.7 MI S. OF STUART INT. ' (1) ·
'7MI NORTH OF SR-60 ' (1) ·
'9.2MI N OF SR-60 ' (1) ·
'Buffer Preserve Drive ' (1) ·
'I-4 EB over Tomoka River ' (1) ·
'I-4 WB over Tomoka River ' (1) ·
'I-95 NB over Spruce Creek' (1) ·
'SR-415- St.Johns River ' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1)
Showing below up to 18 results in range #1 to #18.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)