Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-37 Canal ' (1) ·
'E-3 CANAL ' (1) ·
'Halifax Canal ' (1) ·
'L-38 CANAL ' (1) ·
'L-5 CANAL ' (1) ·
'Lateral A Canal ' (1) ·
'Lateral D Canal ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'LWDD L-30 CANAL ' (1) ·
'LWDD LAT. 38 CANAL ' (1) ·
'Main Relief Canal ' (1) ·
'South Relief Canal ' (1) ·
'Ten Mile Creek ' (1) ·
'WPB CANAL C-51 ' (1)
'16th St/College Ln' (1) ·
'66th Avenue ' (1) ·
'CR-609 (82nd Ave.)' (1) ·
'CR605 Old Dixie ' (1) ·
'Daytona Avenue ' (1) ·
'FLAVOR PICT ROAD ' (1) ·
'Hanley Rd. S 25th ' (1) ·
'HYPOLUXO ROAD EB ' (1) ·
'HYPOLUXO ROAD WB ' (1) ·
'JOG RD NB ' (1) ·
'JOG ROAD (NB) ' (1) ·
'JOG ROAD NB ' (1) ·
'JOG ROAD SB ' (1) ·
'Jupiter Boulevard ' (1) ·
'KIRK ROAD ' (1) ·
'LYONS ROAD ' (1)
705923 (1) ·
795504 (1) ·
884084 (1) ·
884086 (1) ·
884098 (1) ·
884099 (1) ·
934272 (1) ·
934345 (1) ·
934346 (1) ·
934751 (1) ·
934938 (1) ·
934939 (1) ·
934948 (1) ·
934952 (1) ·
934956 (1) ·
944016 (1)
'0.02 MI S/O LPGA Blvd ' (1) ·
'0.5Mi WEST OF CR-809 ' (1) ·
'0.6MI S of SOUTHERN BLVD ' (1) ·
'0.7Mi South of SR-60 ' (1) ·
'1.0MI W OF MILITARY TRAIL' (1) ·
'1.1 Mile S of CR-611B ' (1) ·
'1.3 Mi. North of CR-606 ' (1) ·
'1.9 Mi South of SR-60 ' (1) ·
'1.9Mi S of WOOLBRIGHT ' (1) ·
'1MI N OF CLINT MOORE RD ' (1) ·
'1MI S OF LINTON BLVD ' (1) ·
'At Minton Rd. Intersectn ' (1) ·
'AT SR-80 SOUTHERN BLVD ' (1) ·
'Inter 66th Ave/College Ln' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1)
Showing below up to 16 results in range #1 to #16.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)