Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
bridge data > Service Under 042b:
Highway - Waterway
& Superstructure 059 :
Satisfactory or
Very Good
Use the filters below to narrow your results.
'Angle Rd - Belcher Canal' (1) ·
'Angle Rd.- Belcher Canal' (1) ·
'City St. & Crane Creek ' (1) ·
'CR-515 & Indian River ' (1) ·
'Depot Ave & El Rio Canal' (1) ·
'FL TPK SR-91 ' (1) ·
'FL. TURNPIKE ' (1) ·
'Fla. Turnpike & 2 canals' (1) ·
'Galiano Rd & C-24 Canal ' (1) ·
'Galiano Rd. & C-24 Canal' (1) ·
'Indian River ' (1) ·
'Intracoastal Waterway ' (1) ·
'IWW Indian River ' (1) ·
'Okeechobee Waterway ' (1) ·
'Service Rd & Canal ' (1) ·
'SR-91 TPK-DRAINAGE CANAL' (1) ·
'SR-91 TPK/DRAINAGE CANAL' (1) ·
'Turnpike (SR-91) ' (1) ·
'US 98-SR 80-WPB Canal ' (1)
'45th Street CR-702' (1) ·
'CR-714 Indian St. ' (1) ·
'EB Spanish Rvr Bvd' (1) ·
'Hypoluxo Rd ' (1) ·
'I 95 SR 9 NB ' (1) ·
'NB I-95 (SR-9) ' (1) ·
'SB I-95 (SR-9) ' (1) ·
'SR-401 SB ' (1) ·
'SR-44 ' (1) ·
'SR-520 EB ' (1) ·
'SR-528 WB ' (1) ·
'SR-91TPK NBSB 97.4' (1) ·
'SW 18TH ST WB ' (1) ·
'SW 18TH ST. EB ' (1) ·
'US-1 ' (1) ·
'WB Forest Hill Bld' (1) ·
'WB Spanish River ' (1) ·
'YAMATO RD EB ' (1) ·
'YAMATO RD WB ' (1)
700006 (1) ·
700015 (1) ·
700030 (1) ·
700137 (1) ·
790172 (1) ·
894062 (1) ·
930154 (1) ·
930226 (1) ·
930497 (1) ·
930514 (1) ·
931004 (1) ·
934166 (1) ·
934367 (1) ·
934925 (1) ·
934926 (1) ·
934945 (1) ·
934946 (1) ·
940092 (1) ·
940093 (1) ·
940113 (1) ·
940114 (1)
'0.1 MI West of SR-76 ' (1) ·
'0.5 mi N of Atlantic Ave ' (1) ·
'0.9MI W OF POWERLINE RD ' (1) ·
'1.0 M West of Haverhill R' (1) ·
'1.2 Mi. East of Lyons Rd.' (1) ·
'1.7 miles east of SR 7 ' (1) ·
'2 mi. N of Gatlin Blvd. ' (1) ·
'2.5 mi. N of SR 70 ' (1) ·
'2.9MI W OF MILITARY TRAIL' (1) ·
'4.3 MI NORTH OF SR-802 ' (1) ·
'EB SR800 .2mi West of A1A' (1) ·
'SR 520 EB - Indian River ' (1) ·
'SR-401 SB - Barge Canal ' (1) ·
'SR-44 - Indian River ' (1) ·
'SR-528 WB - CR-515 ' (1) ·
'US-1 - Crane Cr & City St' (1) ·
'WB SR800.2Mi west of US-1' (1)
26195316 (1) ·
26195370 (1) ·
26231074 (1) ·
26231130 (1) ·
26233917 (1) ·
26233970 (1) ·
26280900 (1) ·
26342040 (1) ·
26390300 (1) ·
26404472 (1) ·
26453630 (1) ·
27093370 (1) ·
27171853 (1) ·
27172347 (1) ·
27281041 (1) ·
27281411 (1) ·
28043878 (1) ·
28212281 (1) ·
28240489 (1) ·
28243313 (1) ·
29021928 (1)
80041209 (1) ·
80041536 (1) ·
80052100 (1) ·
80080080 (1) ·
80095982 (1) ·
80101305 (1) ·
80101307 (1) ·
80101583 (1) ·
80101586 (1) ·
80102300 (1) ·
80102700 (1) ·
80151390 (1) ·
80251481 (1) ·
80251602 (1) ·
80252971 (1) ·
80254109 (1) ·
80360835 (1) ·
80375608 (1) ·
80430520 (1) ·
80444580 (1) ·
80542264 (1)
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Bridge foundations (including piles) on dry land well above flood water elevations. (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1)
Showing below up to 21 results in range #1 to #21.