Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'ANGLE RD & BELCHER CANAL' (1) ·
'CANAL L-20 ' (1) ·
'CR-515 & Indian River ' (1) ·
'Fla. Turnpike & 2 canals' (1) ·
'Indian River ' (1) ·
'INTRACOASTAL WATERWAY ' (1) ·
'IWW Halifax River ' (1) ·
'IWW Indian River ' (1) ·
'Lake Washington Road ' (1) ·
'SR 91 TPK & CANAL ' (1) ·
'SR-76 & St. Lucie Canal ' (1) ·
'SR-91 TPK & BOCA RIO RD.' (1) ·
'SR-91/TPK & BOCA RIO RD.' (1)
'EB Forest Hill Bld' (1) ·
'I-95 NB ' (1) ·
'MINUTE MAID RD 165' (1) ·
'PALMETTO PARK ROAD' (1) ·
'PALMETTO PK RD(EB)' (1) ·
'PALMETTO PK RD(WB)' (1) ·
'SR-430 EB ' (1) ·
'SR-430 WB ' (1) ·
'SR-44 ' (1) ·
'SR-520 WB ' (1) ·
'SR-528 EB ' (1) ·
'SR-A1A ' (1) ·
'SR91 NB TPK 157.9 ' (1) ·
'SR91 NB TPK 158.6 ' (1) ·
'SR91 SB TPK 157.9 ' (1) ·
'SR91 SB TPK 158.6 ' (1) ·
'US-441 SR-15 ' (1)
700061 (1) ·
700109 (1) ·
700123 (1) ·
790148 (1) ·
790152 (1) ·
790174 (1) ·
790175 (1) ·
890103 (1) ·
934349 (1) ·
934907 (1) ·
934908 (1) ·
934909 (1) ·
940057 (1) ·
940058 (1) ·
940059 (1) ·
940073 (1) ·
940083 (1)
'0.8 MILE EAST OF US-1 ' (1) ·
'1.7 mi. east of SR-7 ' (1) ·
'1.83 MILES N OF SR-68 ' (1) ·
'2.5 MI NORTH OF SR-68 ' (1) ·
'2.53 MI NORTH OF SR-68 ' (1) ·
'2MI E of SR-7 US-441 ' (1) ·
'9.38 MI NORTH OF SR-68 ' (1) ·
'I-95 NB -Lk Washington Rd' (1) ·
'SR 520 WB Indian River ' (1) ·
'SR-430 EB - Halifax River' (1) ·
'SR-430 WB - Halifax River' (1) ·
'SR-44 - Indian River ' (1) ·
'SR-528 EB over CR-515 ' (1) ·
'SR-A1A over Halifax River' (1) ·
'US-441 and SR-76 ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1)
Showing below up to 17 results in range #1 to #17.