Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'10th Ave North ' (1) ·
'Belvede to NB I-95' (1) ·
'CR-707(Citrus Ave)' (1) ·
'French Avenue ' (1) ·
'NB SR-5 (US-1) ' (1) ·
'Peninsula Corp Dr ' (1) ·
'Robt J Conla Bl EB' (1) ·
'Robt J Conla Bl WB' (1) ·
'SB SR-5 (US-1) ' (1) ·
'SB US-1/SR-5 ' (1) ·
'SR-405 EB ' (1) ·
'SR-405 WB ' (1) ·
'SR-44 ' (1) ·
'US-1 NB ' (1)
700002 (1) ·
700103 (1) ·
704150 (1) ·
704151 (1) ·
790087 (1) ·
790176 (1) ·
794006 (1) ·
890001 (1) ·
890021 (1) ·
890151 (1) ·
930263 (1) ·
930443 (1) ·
930485 (1) ·
940047 (1)
'1.3 mile S of Linton Rd. ' (1) ·
'1.35 mi North of SR-516 ' (1) ·
'10th Ave North over I 95 ' (1) ·
'1mi S of SR-707 on SR-5 ' (1) ·
'2 miles West of US-17 ' (1) ·
'Citrus Ave/FEC RR ' (1) ·
'NB SR-5 1mi. S of CR 708 ' (1) ·
'North of Belvedere Rd ' (1) ·
'SB SR-5 1mi. S of CR 708 ' (1) ·
'SR-405 EB - FECRR ' (1) ·
'SR-405 WB - FECRR ' (1) ·
'SR-44 over CSX-RR ' (1) ·
'US-1 NB - FECRR ' (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 14 results in range #1 to #14.