Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BRANCH OF ICWW ' (1) ·
'BRITT CANAL ' (1) ·
'C-51 Canal ' (1) ·
'CANAL E-4 ' (1) ·
'Creek ' (1) ·
'EL RIO CANAL ' (1) ·
'L-19 Canal ' (1) ·
'LAKE WORTH ' (1) ·
'LATERAL A CANAL ' (1) ·
'LATERAL A CANAL ' (1) ·
'LATERAL C CANAL ' (1) ·
'LATERAL CANAL ' (1) ·
'OKEECHOBEE RIM CANAL ' (1) ·
'PARK LATERAL CANAL ' (1) ·
'RIO MAR BAY ' (1) ·
'S-5 Discharge Canal ' (1) ·
'Yacht Club Cut ' (1)
'101ST STREET ' (1) ·
'109TH STREET ' (1) ·
'21ST ST SW ' (1) ·
'53RD STREET ' (1) ·
'61ST./PECAN GROVE ' (1) ·
'65TH ST. ' (1) ·
'8TH ST. CR-612 ' (1) ·
'97 TH STREET ' (1) ·
'BRITT RD ' (1) ·
'CR-717 ' (1) ·
'Fifth Street ' (1) ·
'HIGHLAND GOLF CRSE' (1) ·
'Indian Lake Road ' (1) ·
'ISLAND ROAD ' (1) ·
'JUPITER ISLAND PK ' (1) ·
'Levee Road ' (1) ·
'MISSION HILL ROAD ' (1) ·
'Service Road ' (1) ·
'VETERANS WALK ' (1)
790801 (1) ·
795701 (1) ·
880049 (1) ·
884003 (1) ·
884024 (1) ·
884036 (1) ·
884038 (1) ·
884047 (1) ·
884063 (1) ·
884064 (1) ·
885808 (1) ·
894000 (1) ·
930072 (1) ·
930807 (1) ·
930808 (1) ·
930809 (1) ·
930811 (1) ·
934126 (1) ·
934517 (1) ·
935305 (1) ·
935508 (1) ·
936802 (1)
'.2MI E OF HOMEWOOD ROAD ' (1) ·
'0.1mi E of Riverside Dr ' (1) ·
'0.3MI W OF CR-507 ' (1) ·
'0.3MI WEST OF CR-507 ' (1) ·
'0.4 mi N. of SR-80 ' (1) ·
'0.4MI W of S. COUNTY ROAD' (1) ·
'0.5MI N OF JUPITER BCH RD' (1) ·
'1.0 Mi South of CR-827 ' (1) ·
'1.9 MI WEST OF SR-715 ' (1) ·
'100FT E OF SOUTH LAKE DR ' (1) ·
'13.5 Mi S/O S/B E of US27' (1) ·
'1Mi W of US-1 ' (1) ·
'2.3mi N on Indian Lake Rd' (1) ·
'21.0 Mi North of US-27 ' (1) ·
'25FT. EAST OF 66TH AVE. ' (1) ·
'33FT E OF CR-611 43RD AVE' (1) ·
'6.3MI S of SoBay at US-27' (1) ·
'AT 141st ST ' (1) ·
'AT 74TH AVE. ' (1) ·
'AT CR-615 (66TH AVE.) ' (1) ·
'INSIDE RIVERSIDE PARK ' (1)
26270705 (1) ·
26284041 (1) ·
26290520 (1) ·
26294400 (1) ·
26342300 (1) ·
26354162 (1) ·
26410978 (1) ·
26414288 (1) ·
26421986 (1) ·
26562485 (1) ·
27140482 (1) ·
27335447 (1) ·
27370119 (1) ·
27385354 (1) ·
27412374 (1) ·
27421622 (1) ·
27424275 (1) ·
27461915 (1) ·
27464527 (1) ·
27473810 (1) ·
29004760 (1) ·
29095886 (1)
80023337 (1) ·
80041914 (1) ·
80044085 (1) ·
80054787 (1) ·
80102658 (1) ·
80170422 (1) ·
80220390 (1) ·
80255073 (1) ·
80274430 (1) ·
80274465 (1) ·
80274529 (1) ·
80284675 (1) ·
80365044 (1) ·
80365155 (1) ·
80365186 (1) ·
80391185 (1) ·
80423700 (1) ·
80423874 (1) ·
80424695 (1) ·
80492277 (1) ·
80545465 (1) ·
81091698 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 22 results in range #1 to #22.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)