Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BRANCH OF ICWW ' (1) ·
'CANAL E-4 ' (1) ·
'Creek ' (1) ·
'E3 CANAL ' (1) ·
'E3-canal ' (1) ·
'EL RIO CANAL ' (1) ·
'FL TPK SR-91 ' (1) ·
'Hillsboro Canal L14 ' (1) ·
'L-19 Canal ' (1) ·
'LATERAL A CANAL ' (1) ·
'Lateral A Canal ' (1) ·
'LATERAL CANAL ' (1) ·
'LWDD C-16 CANAL ' (1) ·
'LWDD E 3-1/2 CANAL ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'M CANAL ' (1) ·
'Main Relief Canal ' (1) ·
'OKEECHOBEE RIM CANAL ' (1) ·
'RCA CANAL ' (1) ·
'RIO MAR BAY ' (1) ·
'SR-507 ' (1)
'21ST ST SW ' (1) ·
'27th Street ' (1) ·
'57th Street ' (1) ·
'61ST./PECAN GROVE ' (1) ·
'CAMINO REAL ' (1) ·
'CONGRESS AVE ' (1) ·
'CR-717 ' (1) ·
'HIGHLAND GOLF CRSE' (1) ·
'Hypoluxo Rd ' (1) ·
'Indian Lake Road ' (1) ·
'JUPITER ISLAND PK ' (1) ·
'LAKE IDA ROAD ' (1) ·
'Levee Road ' (1) ·
'Melaleuca Lane ' (1) ·
'NW 13 ST ' (1) ·
'PROS. FARMS ROAD ' (1) ·
'SEACREST BLVD. ' (1) ·
'SR-15 Main St. ' (1) ·
'SR-507 ' (1) ·
'SUMMIT BLVD ' (1) ·
'VETERANS WALK ' (1)
700186 (1) ·
790801 (1) ·
884038 (1) ·
884047 (1) ·
884077 (1) ·
884093 (1) ·
885808 (1) ·
930072 (1) ·
930338 (1) ·
930807 (1) ·
930808 (1) ·
930809 (1) ·
934126 (1) ·
934139 (1) ·
934228 (1) ·
934258 (1) ·
934361 (1) ·
934367 (1) ·
934499 (1) ·
934960 (1) ·
934964 (1) ·
934965 (1) ·
935215 (1) ·
935508 (1)
'.2MI E OF HOMEWOOD ROAD ' (1) ·
'0.03Mi E of NW 15TH AVE ' (1) ·
'0.3MI E OF CONGRESS ' (1) ·
'0.4 MI W of US-1 ' (1) ·
'0.4MI W OF HAVERHILL BLVD' (1) ·
'0.5MI N OF JUPITER BCH RD' (1) ·
'0.6Mi NORTH OF SR-804 ' (1) ·
'0.7MI S OF 45TH STREET ' (1) ·
'1.0 Mi South of CR-827 ' (1) ·
'1.1 MI E OF JOG ROAD ' (1) ·
'1.1Mi W of Miltiary Trail' (1) ·
'1.2 Mi. East of Lyons Rd.' (1) ·
'1.9 MI WEST OF SR-715 ' (1) ·
'13.5 Mi S/O S/B E of US27' (1) ·
'130ft. S of Aviation Blvd' (1) ·
'2.3mi N on Indian Lake Rd' (1) ·
'33FT E OF CR-611 43RD AVE' (1) ·
'6.3MI S of SoBay at US-27' (1) ·
'AT CR-615 (66TH AVE.) ' (1) ·
'At East Canal St. ' (1) ·
'INSIDE RIVERSIDE PARK ' (1) ·
'S SIDE OF RCA/MONET ROAD ' (1) ·
'SR-507 over Crane Creek ' (1)
26203857 (1) ·
26214151 (1) ·
26270705 (1) ·
26281579 (1) ·
26281595 (1) ·
26290520 (1) ·
26322120 (1) ·
26342040 (1) ·
26342300 (1) ·
26354162 (1) ·
26362838 (1) ·
26394749 (1) ·
26411023 (1) ·
26421986 (1) ·
26445836 (1) ·
26501410 (1) ·
26562485 (1) ·
27335447 (1) ·
27385110 (1) ·
27385354 (1) ·
27415031 (1) ·
27421622 (1) ·
28040738 (1) ·
29095886 (1)
80035203 (1) ·
80041914 (1) ·
80042035 (1) ·
80051796 (1) ·
80052073 (1) ·
80054787 (1) ·
80054960 (1) ·
80065459 (1) ·
80074101 (1) ·
80074938 (1) ·
80075060 (1) ·
80102300 (1) ·
80220390 (1) ·
80242065 (1) ·
80255073 (1) ·
80274430 (1) ·
80274502 (1) ·
80371675 (1) ·
80391185 (1) ·
80400416 (1) ·
80423700 (1) ·
80423874 (1) ·
80424695 (1) ·
81091698 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Bridge foundations (including piles) on dry land well above flood water elevations. (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1)
Showing below up to 24 results in range #1 to #24.