Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Berrys Canal ' (1) ·
'CANAL ' (1) ·
'Canal C-47 ' (1) ·
'CORAL GARDENS OUTFALL ' (1) ·
'HALF MILE LAKE ' (1) ·
'HILLSBORO CANAL L-14 ' (1) ·
'I-95 (SR-9) ' (1) ·
'Indian River East Relief' (1) ·
'INTRACOASTAL WATERWAY ' (1) ·
'LAKE CLARKE CHANNEL ' (1) ·
'LWDD CANAL L-9 ' (1) ·
'LWDD E-4 CANAL ' (1) ·
'Moore's Creek ' (1) ·
'North Relief Canal ' (1) ·
'SFWMD C-15 CANAL ' (1) ·
'South Relief Canal ' (1) ·
'Tomoka River ' (1)
'56th Place North ' (1) ·
'BRANT DR/CARL BOTT' (1) ·
'Brittan Avenue ' (1) ·
'Emerson Ave 27th A' (1) ·
'KELLER ROAD ' (1) ·
'MEDITERRANEAN RD ' (1) ·
'NORFOLK BLVD. ' (1) ·
'PALMETTO PARK ROAD' (1) ·
'PINE LAKE ROAD ' (1) ·
'SE 7TH STREET ' (1) ·
'SE HARBOR ISLAND ' (1) ·
'SR-44 ' (1) ·
'SR-732 Jensen Bch.' (1) ·
'STAR ISLAND WAY ' (1) ·
'US-1 (SR-5) ' (1) ·
'US-92 WB ' (1) ·
'W/B S.R. 704 ' (1) ·
'WEST LAKE DRIVE ' (1)
705915 (1) ·
790021 (1) ·
790149 (1) ·
880088 (1) ·
884082 (1) ·
890146 (1) ·
894001 (1) ·
894017 (1) ·
894018 (1) ·
894047 (1) ·
930183 (1) ·
934908 (1) ·
935100 (1) ·
935501 (1) ·
936262 (1) ·
936263 (1) ·
936350 (1) ·
940151 (1)
'.2MI S of LINDELL BLVD ' (1) ·
'.75mi E. of Indian R Dr. ' (1) ·
'.7mi. E of Congress Ave. ' (1) ·
'0.1MI. E of KANNER HWY ' (1) ·
'0.2 mi S of Cocoa Street ' (1) ·
'0.2 MI W of I-95 ' (1) ·
'0.2Mi E of GOMEZ AVE. ' (1) ·
'0.3Mi E of GOMEZ AVE. ' (1) ·
'0.5 MI. E OF SR-80 ' (1) ·
'0.8 MILE EAST OF US-1 ' (1) ·
'0.8Mi S of BRITT ROAD ' (1) ·
'1 MI S OF FOREST HILL BVD' (1) ·
'1 mile North of SR-70 ' (1) ·
'1.7 MI S OF FOREST HILL ' (1) ·
'2.8MI S OF SR-60 ' (1) ·
'56th Place North ' (1) ·
'SR-44 - Berrys Canal ' (1) ·
'US-92 WB-Tomoka River ' (1)
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 18 results in range #1 to #18.